REGULAR MEETING DECEMBER 22 2011 414 <br /> operational cost would also increase if a different vendor is selected because additional software <br /> licenses would need to be purchased, and yearly software maintenance fees for both software <br /> packages and support training for two different software packages would be needed. <br /> Standardizing on the Cues CCTV camera system hardware is also critical. If another <br /> manufacture's camera hardware is selected the City would have to stock spare parts for two <br /> different manufactures. Employees would also need to receive maintenance training on both <br /> systems. It would also be hard to establish and use the same Standard Operating Procedures if <br /> the equipment is different on both trucks. By selecting a different equipment manufacturer <br /> the overall daily operational cost would increase. Therefore, Mr. Inks made a motion that the <br /> recommendation be accepted and the Special Purchase be approved as outlined above. Mr. Price <br /> seconded the motion, which carried. <br /> APPROVAL OF QUOTE AWARD — REPLACEMENT LIGHT POLES FOR KNOCKED <br /> DOWN POLES SIGNAL/LIGHTS <br /> Mr. Gilot advised that the Board is in receipt of a request from Mr. Rob Nichols, Engineering, to <br /> award the purchase of the above referenced equipment to Tech-Lite Corporation, 7718 Loma Ct., <br /> Fishers, Indiana 46038, in the amount of$28,650.00. Mr. Nichols noted this purchase was placed <br /> on the agenda as a Special Purchase, but it should be approved as a quote award. He noted three <br /> quotes were solicited, one responded that they could not meet the INDOT signal mast arm design <br /> standards required, and the other quote was non-responsive due to submitting incorrect materials. <br /> Therefore, Mr. Inks made a motion that the recommendation be accepted and the quote award be <br /> approved as outlined above. Mr. Price seconded the motion, which carried. <br /> APPROVE CHANGE ORDER NO. 4 — MAYFLOWER ROAD CONSTRUCTION — <br /> PROJECT NO. 110-036 AEDA TIF <br /> Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 4 on behalf <br /> of C&E Excavating, Inc., 53767 County Road 9, Elkhart, Indiana 46514, indicating the contract <br /> amount be decreased by $9.76 for a modified contract sum, including this Change Order, in the <br /> amount of$2,584,938.95. Mr. Villa informed the Board that the difference is from the removal <br /> of some line items from the original specifications and the addition of new line items. Upon a <br /> motion made by Mr. Inks, seconded by Mr. Price and carried, the Change Order was approved. <br /> APPROVE CHANGE ORDER NO. 3 --- MAYFLOWER ROAD SANITARY SEWER <br /> EXTENSION PHASE I—PROJECT NO. 109-055 (TIF/SEWER BOND <br /> Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 3 on behalf <br /> of C&E Excavating, Inc., 53767 County Road 9, Elkhart, Indiana 46514, indicating the contract <br /> amount be decreased by $1,073.50 for a modified contract sum, including this Change Order, in <br /> the amount of $1,887,931.50. Upon a motion made by Mr. Price, seconded by Mr. Inks and <br /> carried, the Change Order was approved. <br /> APPROVE CHANGE ORDER NO. 1 — MORRIS PERFORMING ARTS CENTER ENTRY <br /> DOORS WINDOWS AND RESTROOM RENOVATION - PROJECT NO. 111-024 (CED <br /> AND MPAQ <br /> Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 on behalf <br /> of Brown & Brown General Contractors, Inc., P.O. Box 487, Wakarusa, Indiana, indicating the <br /> contract amount be increased by $18,672.00 for a modified contract sum, including this Change <br /> Order, in the amount of$626,564.00. Upon a motion made by Mr. Inks, seconded by Mr. Price <br /> and carried, the Change Order was approved. <br /> APPROVE CHANGE ORDER NOS. 2 AND 3 — EAST BANK SEWER SEPARATION — <br /> PROJECT NO. 109-070A (EDIT) <br /> Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order Nos. 2 and 3 on <br /> behalf of Woodruff& Sons, Inc., P.O. Box 450, Michigan City, Indiana. Change Order No. 2 <br /> indicates the contract amount be increased by $52,236.89 for a modified contract sum., including <br /> this Change Order, in the amount of$2,072,570.77, and a time extension of seventy-seven (77) <br /> days. Change Order No. 3 indicates the contract amount be decreased by $10,455.08 for a <br /> modified contract sum, including this Change Order, in the amount of $2,062,115.69. Upon a <br /> motion made by Mr. Inks, seconded by Mr. Price and carried, the Change Orders were approved. <br />