Laserfiche WebLink
REGULAR MEETING DECEMBER 22, 2011 426 <br /> RELEASE OF CITY EASEMENTS - THE AREA BOUND ON THE EAST BY NOTRE <br /> DAME AVENUE-, ON THE NORTH BY CEDAR STREET; ON THE SOUTH BY LASALLE <br /> STREET• AND ON THE WEST BY ST. LOUIS BOULEVARD <br /> In a memorandum to the Board, Mr. Anthony Molnar, Engineering, asked that the above <br /> referenced easements be released for Danch Harner & Associates, Inc., on behalf of the Diocese <br /> of Fort Wayne-South Bend, Inc., for the purpose of Development of the St. Joseph High School <br /> athletic field. In his Memorandum, Mr. Molnar stated that after review, it was found that all of <br /> the sanitary sewer and water mains have been either removed or abandoned on the site. <br /> Therefore, upon a motion made by Mr. Gilot, seconded by Mr. Price and carried, the above <br /> referenced release of easements was approved. <br /> APPROVE TRAFFIC CONTROL DEVICES <br /> Upon a motion made by Mr. Price, seconded by Mr. Inks and carried, the following traffic <br /> control devices were approved: <br /> NEW INSTALLATION: Handicapped Accessible Parking Space Sign <br /> LOCATION: 3206 Revere Place <br /> REMARKS: All criteria has been met <br /> EXTENSION: Reserved Handicapped Accessible Parking Space Sign <br /> APPLICANT: Thomas Stewart <br /> LOCATION: East Side of Lafayette Blvd., Third Space North of <br /> Jefferson.Blvd. <br /> REMARKS: All criteria has been met <br /> NEW INSTALLATION: No Parking Sign <br /> LOCATION: West Side of Laurel St. — 110 Feet from West Laurel Ct. to <br /> Kroc Center Drive off Laurel <br /> REMARKS: To Accommodate Trucks Turning into Kroc Center <br /> Parking Lot for Deliveries <br /> FILING OF QUARTERLY CONSTRUCTION REPORT - OCTOBER THROUGH <br /> DECEMBER 2011 <br /> Mr. Toy Villa, Public Construction Manager, Engineering, submitted a Quarterly Construction <br /> Report for the months of October, November, and December, 2011, summarizing construction <br /> projects in the Division of Engineering. Upon a motion made by Mr. Gilot, seconded by Mr. Inks <br /> and carried, the Quarterly Construction Report was accepted for filing. <br /> FILING OF MONTHLY AND PERFORMANCE MEASURE REPORTS — DEPARTMENT <br /> OF PUBLIC WORKS <br /> The Division of Central Services submitted its Monthly and Performance Report for the month <br /> of November 2011. There being no further discussion, upon a motion made by Mr. Gilot, <br /> seconded by Mr. Inks and carried, the monthly report was accepted and filed. <br /> FILING OF SAFETY REPORTS —DEPARTMENT OF PUBLIC WORKS <br /> The Divisions of Central Services and Engineering submitted their respective Safety Reports for <br /> November 2011. These reports reflect injuries/accidents for each month and provide for a <br /> comparison. There being no further discussion, upon a motion made by Mr_ Gilot, seconded by <br /> Mr. Inks and carried, the reports were accepted and filed. <br /> APPROVE INDUSTRIAL WASTEWATER DISCHARGE PERMIT EXTENSION <br /> In a Memorandum to the Board, Ms. Kim Thompson, Division of Environmental Services, <br /> submitted the following Wastewater Discharge Permit extension and recommended approval: <br /> COMPANY: Royal Adhesives and Sealants, LLC <br /> LOCATION: 2001 West Washington Street <br /> REMARKS: Extension to January S, 2017 <br /> There being no further discussion, upon a motion made by Mr. Inks, seconded by Mr. Price and <br /> carried,the permit extension was approved. <br />