Laserfiche WebLink
3 <br /> on-center along the North, East, South and West property lines to being <br /> allowed to use the existing landscaping; <br /> 3) . A Variance from providing the minimum required three (3) parking <br /> spaces for the existing passive park to providing no parking spaces; <br /> 4) . A. Variance from the maximum allowed height of 150 ft. for structures <br /> to a maximum height of 194 ft. for an existing smoke stack; <br /> 5) . A Variance from the minimum required 10 ft. Side-yard setback along <br /> the West property line to 0 ft. for the existing structure connecting <br /> the shown existing smoke stack and the existing primary building located <br /> on Parcel "A"; <br /> 6) . A Variance from the minimum required 10 ft. Side-yard setback along <br /> the South property line to a minimum of 0.10 ft. for an existing trellis <br /> structure and pavers and to a minimum of 9 ft. for an existing smoke <br /> stack; <br /> 7) . A Variance from the minimum required lot width and frontage of 150 <br /> ft. on a public street to a minimum of 123.05 ft. more or less. <br /> The Petitioners are the owners of the real estate parcel shown on <br /> the attached site plan and as shown in the records of the St. Joseph <br /> County, Indiana Auditor's office. The Petition property presently has a <br /> Zoning classification of "GI" General. Industrial District. <br /> The Petitioners are working closely with the City of South Bend on a <br /> Streetscape, Trail system and Memorial Park project that is being done <br /> along Oliver Plow Court. These improvements will help to link the <br /> existing residential neighborhoods West of Arnold Street with amenities <br /> being constructed along Chapin Street and further to the East in <br /> downtown South Bend including the recently updated Coveleski Regional <br /> Stadium complex. The first phase of this Streetscape, Trail system and <br /> Memorial Park have been built as shown on the attached site plan. The <br /> next phase of development for this plan is to take the existing well- <br /> known Oliver Plow smoke stack structure and place it onto the recently <br /> completed Oliver Memorial Park site. The intent is to allow for the <br /> Petitioners to transfer the created park property to the City for a <br /> Passive Park that will be maintained by the City. The Petitioner's <br /> representatives met with the Building Department and Area Plan <br /> Commission staff's to discuss this project and to determine how to <br /> proceed with the creation of the Park site. The result of that meeting <br /> was the determination, that in order to allow for the transfer of the <br /> property as a Park to the City, a petition Mould be required to request <br /> the approval of two Special Exception Uses and several Variances for <br /> each of the two parcels involved. <br /> As shown the split proposed would have the existing Rose Brick & <br /> Materials facility located on Parcel "A" and the Passive Park located on <br /> Parcel "B". Based on the present City Zoning Ordinances, the existing <br /> Rose Brick & Materials will require approval of a Special Exception to <br />