My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lateral Proposal - St Joe Valley Metronet - Add 8 Locations to Metronet Buildout
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Lateral Proposal - St Joe Valley Metronet - Add 8 Locations to Metronet Buildout
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:52:06 AM
Creation date
9/11/2018 4:26:50 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
METRONET <br />6 <br />City of South Bend <br />227 W. Jefferson #1200N <br />South Bend', Indiana, 46601 <br />4016 Fellows, South Bend <br />Proposal for new conduit and fiber at 4016 Fellows, South Bend: <br />St. Joe Valley Metronet, Inc. <br />130 S. Maun Street, Ste 276 <br />South Bend, IN 46601 <br />August 29, 2018 <br />Bore 2" & 1-1/4" HDPE approx. (2,120') from Michigan, East along Chippewa to Erskine <br />Maintenance. <br />• Install Tracer and Pull Rope. <br />• Install (5) new handholes. <br />• Install Corning 72-strand Fiber. <br />• Install new fiber panel and splice into the Backbone. <br />• Tie conduit into existing HH. <br />• Proposal does not include Indiana sales tax. <br />• All work quoted first shift 7:100 AM to 3:30 PM <br />We hereby propose to furnish material and', labor in complete accordance with the above <br />specifications for the sum of $44,940.00 (Forty -Four Thousand Nine Hundred Sixty Dollars). <br />All materials are guaranteed to be as specified. All work to be completed in a satisfactory <br />manner according to standard practices. Any alteration or deviation from the above <br />specifications or involving extra costs will be executed only upon written orders, and will become <br />an extra charge over and above this proposal. All agreements are contingent upon strikes, <br />accidents, or delays beyond our control. The Owner will carry fire, tornado, and other necessary <br />insurance. Ourworkeirs are fully covered by Worker's Compensation Insurance. This proposal is <br />valid for 30 days from issue date. <br />ACCEPTANCE OF PROPOSAL <br />The above prices, specifications, and conditions are satisfactory and are hereby accepted. SJVM, Inc. is <br />authorized to do the work as specified. Payment will be made as stated above. <br />The undersigned person executing this Proposal represents and certifies that he/she is a duly authorized <br />officer with authority to execute this Proposal and has the full legal rights, power and authority to enter <br />into this Proposal and to grant the rights and perform the obligation herein; that no third party consent or <br />approval is required to girant such right or perform such obligations hereunder. <br />MIA"Vy,a <br />BOMA of 13�,Wio <br />Signature: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.