My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Hibberd Plaza Improvements Proj No 117-063R - R Yoder Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Change Orders
>
Change Order No 1 - Hibberd Plaza Improvements Proj No 117-063R - R Yoder Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 1:36:45 PM
Creation date
9/11/2018 4:18:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order #1 ATTACHMENT <br />Description Change <br />Item No. <br />Description <br />50 <br />Domestic Water Line, Class 52, 4" 6" DIP <br />51 <br />Fire Protection Water Line 4" 6" DIP <br />Description & Quantity Change <br />Item No. <br />Description <br />Quantity <br />Change <br />Unit <br />Unit Price <br />Total Amount <br />Change <br />22 <br />Sanitary Sewer, PVC SDR 35, 4" 6" <br />153 <br />LF <br />$165,711 <br />$25,353.63 <br />Quantity Change <br />Item No. <br />Description <br />Quantity <br />Change <br />Unit <br />Unit Price <br />Total Amount <br />Change <br />18 <br />Underdrain, Socked, 4" <br />35 <br />LF <br />$46.90 <br />$1,641.50 <br />21 <br />Storm Sewer Pipe (drain to pavers & connect at lateral), 6" <br />211 <br />LF <br />$44.50 <br />$9,389.50 <br />23 <br />Clean -out Tee (Sanitary & Roof Drains) <br />1 <br />EA <br />$348.17 <br />$348.17 <br />24 <br />fGas +fte <br />-17 <br />LF <br />$170.71 <br />-$2,902A0 <br />36 <br />Wigatiert <br />-1 <br />LS <br />$11,120.00 <br />-$11,120.00 <br />38 <br />Gone te, 8" <br />-48 <br />SYS <br />$130.26 <br />-$6,252.48 <br />39 <br />-1 <br />LS <br />$13,842.00 <br />-$13,842.00 <br />40 <br />Ele6tFie Line Geigneeth a <br />-25 <br />LS <br />$69.64 <br />-$1,741.00 <br />41 <br />Telephone Line Connection <br />-30 <br />LS <br />$46.40 <br />-$1,392.00 <br />42 <br />Asphalt Payemne Clatsl.i.... <br />-1 <br />LS <br />$4,062.00 <br />-$4,062.00 <br />49 <br />-38 <br />LF <br />$459.00 <br />-$17,442.00 <br />57 <br />Gen Fete ADA Rafflp <br />-14 <br />SYS <br />$103.21 <br />-$1,445.00 <br />58 <br />-15 <br />LF <br />$61.87 <br />-$928,00 <br />Added Line <br />Items <br />63 <br />00#1 - Exploratory Digging for Sewer Laterals <br />1 <br />LSUM <br />$1,000.00 <br />$1,000.00 <br />64 <br />CO#1 - 3/" PVC Conduit and Wiring <br />400 <br />LF <br />$18.05 <br />$7,220.00 <br />65 <br />CO#1 - 2" Conduit Stub for METRONET <br />37 <br />LF <br />$21.65 <br />$801.05 <br />66 <br />CO#1 - Unsuitable Soils to Landfill <br />132.1 <br />TON <br />$54.73 <br />$7,229.17 <br />67 <br />CO#1 - Unsuitable Material & Rubble Removed <br />96 <br />CY <br />$22.83 <br />$2,191.20 <br />68 <br />CO#1 - Borrow CIP <br />36 <br />CY <br />$26.13 <br />$940.50 <br />69 <br />C0#1 - Salon South ADA Door <br />1 <br />LSUM <br />$6,768.30 <br />$6,768.30 <br />70 <br />CO#1 - Intermediate Asphalt <br />7 <br />TON <br />$350.00 <br />$2,450.00 <br />71 <br />CO#1 - Flowable Backfill <br />32 <br />CY <br />$81.00 <br />$2,592.00 <br />C0#1 Total Change <br />$6,798.54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.