Laserfiche WebLink
oo <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Nome Lincoln Way East (SR 933) Corridor Improvements - Sample Street to <br />Twyckenham Drive <br />Project No. 117-055-A <br />For Bids Due September 6, 2018 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />2 <br />CONSTRUCTION ENGINEERING <br />MOBILIZATION AND DEMOBILIZATION <br />I <br />1 <br />LS <br />LS <br />$14,000.00 <br />$71,060.85 <br />$14,000.00 <br />$71,0610.85 <br />3 <br />CLEARING RIGHT OF WAY <br />I <br />LS <br />$5,000.00 <br />$5,00,0.00 <br />4 <br />PAVEMENT REMOVAL <br />1723 <br />SYS <br />$15.00 <br />$25,845.00� <br />5 <br />CURB, CONCRETE, REMOVE <br />3875 <br />LFT <br />$5.00 <br />$19,375.00 <br />6 <br />SIDEWALK CONCRETE, REMOVE <br />115 <br />SYS <br />$24.00 <br />$2,760.00 <br />7 <br />INLET, REMOVE <br />7 <br />EACH <br />$500.00 <br />$3,500.00 <br />8 <br />COMMON EXCAVA110N <br />250 <br />CYS <br />$36.00 <br />$9,000.00 <br />9 <br />DESIGN BUILD EROSION AND <br />SEDIMENT CONTROL <br />1 <br />LSUM <br />$3,000.00 <br />$3,000.00 <br />10 <br />TEMPORARY SILT l"ENCE, <br />IUNDlS i M&UTED <br />500 <br />1 UFT <br />$,3.60 <br />$1,800.00 <br />11 <br />B BORR'-BORROW <br />860 <br />CYS <br />$35.00 <br />$30,100.00 <br />12 <br />PCCP PATCHING, FULL DEPTH <br />200 <br />SYS <br />$140.00 <br />$28,000.00 <br />13 <br />GUARDRAIL, REMOVE <br />3023 <br />LFT <br />$3.00 <br />$9,069.00 <br />14 <br />MODIFIED <br />1 <br />EACH <br />$3,700.00 <br />$3,700.00 <br />15 <br />�GUARDRAIL, W-BEAM, MODIFIED, 6 FT <br />3 IN POSTSPACING <br />2450 <br />LFT <br />$29.00 <br />$71,050.00 <br />16 IGUARDRAIL, <br />17 <br />END TREATMENT, OS <br />SIDEWALK, CONCRETE, 4" <br />7 <br />280 <br />EACH <br />SYS <br />$3,3010.00 <br />$50.00 <br />$23,100.00 <br />$14,000.00 <br />18 <br />19 <br />SIDEWALK, CONCRETE, 6- <br />CURB RAMP, CONCRETE <br />28 <br />33.5 <br />SYS <br />SYS <br />$75.00 <br />$185.00 <br />$2,1001.00 <br />$6,197.50 <br />20 <br />CURB, CONCRETE <br />921 <br />LFT <br />$21.00 <br />$19,341.00 <br />21 <br />CURB, CONCRETE, B <br />2954 <br />LFT <br />$15.00 <br />$44,310.00 <br />22 <br />PCCP FOR APPROACHES, 8 IN <br />81.8 <br />SYS <br />$76.00 <br />$6,216.80 <br />23 <br />MULCHING MATERIAL <br />1.5 <br />TON <br />$1,655.00 <br />$2,482.50 <br />24 <br />SEED MIXTURE, R <br />310 <br />LBS <br />$7.80 <br />$2,418D0 <br />25 <br />SODDING, UNDISTIBUTED <br />100 <br />SYS <br />$28.33 <br />$2,833.00 <br />26 1 <br />PIPE, CONNECT TO EXISTING I <br />6 <br />EACH <br />$1,100.00 <br />$6,600.00 <br />1 <br />Version 10/17/2016 Contractor's Bid for Public Works - 7 <br />