My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C (2)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
12-13-11 Packet
>
6C (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 11:56:01 AM
Creation date
12/9/2011 1:11:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
To Redevelopment Commission <br />From Geri Hathaway, Ignition Park Director <br />Subject Ignition Park - Master Plan PowerPoint Presentation <br />Date December 13,2011 <br />BSA LifeStructures was engaged by this Commission to provide an overall plan for <br />the development of Ignition Park. It was determined that this plan should be <br />designed as an innovative infrastructure system that would spark business <br />recruitment and national interest while incorporating integrated sustainable <br />components for the entire park. <br />BSA has provided such a plan and much, much more. This Master Plan provides for <br />efficient transit into and through the park from our major roads, while creating <br />engaging vistas which include visual manifestation of this City's commitment to <br />respect our environment while protecting and enhancing the redundant power and <br />its' controlled cost for our tenants into the future. <br />BSA representatives : Chris Lake Architect <br />Rick Berger Engineer <br />Dan Miles Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.