Laserfiche WebLink
458 <br />Board met in regular session at 9t00 A.M. <br />L..P. Hardy absent. <br />Bids were received, opened and read as follows; - <br />For Pavement, on City Sall Court, from Michigan Street to <br />first north and south alley and first alley west of Michigan Street from <br />Colfax Avenue to La Salle Avenue. <br />Bid of H. N. Barnes <br />Grading per cu. yd. $2.00 <br />No.1. Veeclersburg Black per sq. yd. 2.70 <br />No. 1. Bessmer Black per sq, yd, 2.95 <br />Asphalt filler per sq.,yd. .30 <br />Conenete pavement, per sq yd. 2.30 <br />Manhole covers, each .?_0 <br />Resetting inlets, each 2.00 ' <br />Check $100.00 <br />` Bid of Hoban Roach. I <br />Grading per cu. yd. 1.65 <br />Birke block er sq. yd. 5.50 <br />8 inch conduit pipe per lin ft. .40 <br />Manholes curbs and covers, each 3.00 <br />Marginal curb per lin ft. .40 <br />Resetting inlets, each 3.00 <br />a <br />PAVI�MENT ON KENDALL STREET FROM INDIANA AVENUE TO CALVERT ST. <br />Bid of Williston Construction Co. <br />Curb Oer lin ft. .60 <br />Grading per cu. yd. 1.00 <br />Asphalt Mexican per sq.,yd. 3.07 <br />Asphalt Trinidad per sq. yd. 3.29 <br />Asphaltic concrete Trinidad per sq. yd. 2.71 <br />Asphaltic concrete Mexican per sq.-yd. 2.80 <br />8 inch conduit pipe per lin ft. 1.00 <br />Storm water inlets, each 14.00 <br />Marginal curb per lin ft. .40 <br />Resetting inlets, each 3.00 <br />Resetting manholes covers, each 3.00 <br />Check $394.00 <br />Bid of The White Construction Company. <br />Grading per cu. yd. .95 <br />Curb per lin ft. .50 <br />Walk per sq. ft. .20 <br />S. Asphalt Trinidad per sq. yd. 3.26 <br />S. Asphalt Mexican per sq. yd. 3.01 <br />Asphalte concrete Mexican per sq. yd. 2.67 <br />Asphaltic concrete Trinidad per sq. yd. 2.87 <br />8 inch conduit pipe per lin ft. 1.00 <br />Storm water inlets, each 12.50 <br />Manholes curb qmd covers, each 3.00 <br />Rese Ling inlets, each 3.00 <br />Marginal curb per lin ft. .40 <br />Check $394.00 lb <br />BIDS FOR THE CONSTRUCTION OF THE RIVER PARK TRU NK <br />SEWER DISTRICT NO. 2. <br />Bid of American Engineering and Construction Co. <br />Vitrified pipe 24 inch per lin ft. $7.00 <br />20 7.00 <br />»» »n 18 n» »» 4.00 <br />nn nn 15 "", n» 3.50 <br />»n nn 12 nn nn 2.75 <br />»n nn 10 »n »n 2.50 <br />nn »n 8 »n nn 1.00 <br />»» »n 6 nn nn 1.00 <br />24 inch cast iron pipe per lin ft. 15.00 <br />Reinforced concrete per lin ft. 36 inch 15.00 <br />n» nn nn 33 inch 15.00 <br />30 inch 10.00 <br />Manholes per ft. 7.00. <br />Manholes, eurb'and covers, each 12.00 <br />Storm water inlets, each Check $3,000.00 25.00 <br />Board met in regular session at 9t00 A.M. <br />L..P. Hardy absent. <br />Bids were received, opened and read as follows; - <br />For Pavement, on City Sall Court, from Michigan Street to <br />first north and south alley and first alley west of Michigan Street from <br />Colfax Avenue to La Salle Avenue. <br />Bid of H. N. Barnes <br />Grading per cu. yd. $2.00 <br />No.1. Veeclersburg Black per sq. yd. 2.70 <br />No. 1. Bessmer Black per sq, yd, 2.95 <br />Asphalt filler per sq.,yd. .30 <br />Conenete pavement, per sq yd. 2.30 <br />Manhole covers, each .?_0 <br />Resetting inlets, each 2.00 ' <br />Check $100.00 <br />` Bid of Hoban Roach. I <br />Grading per cu. yd. 1.65 <br />Birke block er sq. yd. 5.50 <br />8 inch conduit pipe per lin ft. .40 <br />Manholes curbs and covers, each 3.00 <br />Marginal curb per lin ft. .40 <br />Resetting inlets, each 3.00 <br />a <br />PAVI�MENT ON KENDALL STREET FROM INDIANA AVENUE TO CALVERT ST. <br />Bid of Williston Construction Co. <br />Curb Oer lin ft. .60 <br />Grading per cu. yd. 1.00 <br />Asphalt Mexican per sq.,yd. 3.07 <br />Asphalt Trinidad per sq. yd. 3.29 <br />Asphaltic concrete Trinidad per sq. yd. 2.71 <br />Asphaltic concrete Mexican per sq.-yd. 2.80 <br />8 inch conduit pipe per lin ft. 1.00 <br />Storm water inlets, each 14.00 <br />Marginal curb per lin ft. .40 <br />Resetting inlets, each 3.00 <br />Resetting manholes covers, each 3.00 <br />Check $394.00 <br />Bid of The White Construction Company. <br />Grading per cu. yd. .95 <br />Curb per lin ft. .50 <br />Walk per sq. ft. .20 <br />S. Asphalt Trinidad per sq. yd. 3.26 <br />S. Asphalt Mexican per sq. yd. 3.01 <br />Asphalte concrete Mexican per sq. yd. 2.67 <br />Asphaltic concrete Trinidad per sq. yd. 2.87 <br />8 inch conduit pipe per lin ft. 1.00 <br />Storm water inlets, each 12.50 <br />Manholes curb qmd covers, each 3.00 <br />Rese Ling inlets, each 3.00 <br />Marginal curb per lin ft. .40 <br />Check $394.00 lb <br />BIDS FOR THE CONSTRUCTION OF THE RIVER PARK TRU NK <br />SEWER DISTRICT NO. 2. <br />Bid of American Engineering and Construction Co. <br />Vitrified pipe 24 inch per lin ft. $7.00 <br />20 7.00 <br />»» »n 18 n» »» 4.00 <br />nn nn 15 "", n» 3.50 <br />»n nn 12 nn nn 2.75 <br />»n nn 10 »n »n 2.50 <br />nn »n 8 »n nn 1.00 <br />»» »n 6 nn nn 1.00 <br />24 inch cast iron pipe per lin ft. 15.00 <br />Reinforced concrete per lin ft. 36 inch 15.00 <br />n» nn nn 33 inch 15.00 <br />30 inch 10.00 <br />Manholes per ft. 7.00. <br />Manholes, eurb'and covers, each 12.00 <br />Storm water inlets, each Check $3,000.00 25.00 <br />