Laserfiche WebLink
439' <br />r <br />. ci%44zda Se p1,e > r .13 �h . , �.�'�iaua . <br />GUARANTEE BOND <br />KNQW ALL MEN BY 'THESE PRESENT' that _____ " <br />,. Y�I►C. Wei--COAs�,�u��i��-C�i��e►___ <br />-------------------- - ---- --- - ----- <br />as principal and ------- ---------`--- ., - - '---------- ----= --. -- --- °----- <br />r � l�l Ca � � C� :• <br />as sureties are held :and firmly bound to the City of South Bend,. Indiana in' -the sum .of -- _____ =_ <br />----__ _ io ow w _ tour _ i��'ed s e_ve x1►_y-_s_ix_ D o l la rs_ a »I_ F iPby Amur AR5 <br />for the payment of,'which, well and truly .to be made, they bind themselves, their -heirs, executors, administrators <br />and assigns by these -presents, <br />The conditions of the above obligation are such that, whereas the above bound ______ _________ <br />r <br />------------- h- `- s. - <br />has completed the work under the contract for the construction of _____________ _________________ <br />----------------- <br />ViF Tea4v lloo Vassar Avesue , <br />----------- ---------------------------------------------------- <br />------------------------------•------------------------------=-------=-=----------- <br />under Improvement Resolution No.-__95_ 0_________ adopted by the Board of Public Works of :said City on the <br />--- day of ----------- _____and whereas, the contractor, principal herein, warrants his <br />workmanship•and all materials .used in the work and agrees that during the guarantee period specified:he will at <br />his own expense make all repairs which may become necessary by reason of improper workmanship =or defective <br />materials. .Such maintenance, however; shall not include any damage to the pavement or to the foundation there- <br />of or to any of the other items of work embraced by this contract resulting from any forces or circuinstances be <br />.yond the control of the contractor, nor is it intended that the contractor shall, become a guarantor of the plans 'and <br />specifications furnished by the city. <br />In case such repairs become necessary the city shall give written notice to the contractor to make the; same, <br />and in case of failure of the contractor to commence such repairs within thirty (30) days after such notice is re- <br />ceived,.the city may make such repairs either by its own employes or by independent contract, and may thereupon <br />recove#"from the contractor and his sureties the reasonable cost of the repairs so made, together with the, cost of <br />the supervision and inspection thereof. The city shall have sixty (60) days after the expiration of said guarantee <br />period. in which to notify the contractor of any such repairs necessary on the date of such expiration. Wheifever <br />(in the case of pavement) the repairs necessary to be made at the expiration of the guarantee period shall amount <br />to more than fifiy per cent. (50%) of the surface of any one block, the entire pavement of that block shall be <br />taken tip and relaid in accordance with the original specifications. <br />Now if the above bound_________hi1e--C-3sS-C-®m�S�jt--Of'_]>��_fi�E� <br />shall for a period of 3__________years from date, maintain such <br />r`W*s4-Ve-V&sftvL-A4e-?sue-* ------------------ <br />and during such time make all repairs, as provided by the foregoing guarantee that may be necessary from any <br />rotting, crumbling or disintegration of materials, or which are made necessary by any imperfection in workman- <br />ship, and shall strictly observe and abide by sections ------ 4-0 ----------- to ------- ----------- inclusive, of the <br />General Specifications, hereto attached and. adopted by the Board of Public Works of said City and shall <br />fulfill all the conditions and stipulations relative to maintainance, therein contained, this obligation shall be void, <br />otherwise to remain in full force and effect. <br />The principal and sureties herein, each for themselves hereby represent that they have examined the plans and <br />specifications furnished by said City for said improvement, and they each hereby waive any and all claims that <br />they now or hereafter may have that any repairs necessary during the guarantee period are due to defects or in- <br />suffiicient requirements in said plans or specifications, anything in said contract or the foregoing guarantee to the <br />contrary notwithstanding. ` <br />Witness out hand and seals this___8"___day <br />PRINCIPAL ________-------- _C TSEICT10-JaSh <br />M. E. W$ITE Pros . & Treas.. <br />APPR OM SURETY--- --------- - - ----------C=--M------- <br />--- <br />;.M�RYLA$ND ClA�Sie U�AIL]T�Y <br />SEY.. 13 91�2 SURETY--- - :-IM-M------------ <br />BOARD3,�� � <br />_ <br />Oi�CPUBLIC <br />A{�WOR <br />R------ _-_ ,5BY L. B. PUGH ER <br />, <br />