BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />�'1'4
<br />Project Name. St. Joseph Street Improvements () 4
<br />Project Number 118-008
<br />For Bids Due: August 28, 2018
<br />Contractor Name: Walsh Kelly, Inc.
<br />BASE BID
<br />Item No.,
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />Construction Engineering
<br />1
<br />LS
<br />6,610.00
<br />$6,610.00
<br />2
<br />Maintaining Traffic
<br />1
<br />LS
<br />15,800,00
<br />$15,800.00
<br />3
<br />Video Record
<br />1
<br />LS
<br />600.00
<br />$600.00
<br />4
<br />Mobilization and Demobilization
<br />1
<br />LS
<br />27,800.00
<br />$27,800.00
<br />5
<br />Clearing of Right of Way
<br />1
<br />LS
<br />34,524.50
<br />$34,524.50
<br />6
<br />Excavation, Common
<br />296
<br />CYS
<br />43.15
<br />$12,772.40
<br />7
<br />Surface Milling, Asphalt, 4 IN
<br />1,582
<br />SYS
<br />8.00
<br />$12,656.00
<br />8
<br />Pavement, Remove
<br />72
<br />SYS
<br />26.00
<br />$1,872.00
<br />9
<br />Curb, Concrete, Remove
<br />140
<br />LFT
<br />13.50
<br />$1,890-00
<br />10
<br />Tree Remove
<br />3
<br />EA
<br />405.00
<br />$1,215.00
<br />11
<br />Structure Remove
<br />1
<br />EA
<br />480.00
<br />$480.00
<br />12
<br />Light Pole & Foundation, Remove
<br />3
<br />EA
<br />410.00
<br />$1,230,00
<br />13
<br />Handhole Remove
<br />2
<br />EA
<br />280.00
<br />$560.00
<br />14
<br />8" VCP Pipe, Remove
<br />51
<br />LFT
<br />18.00
<br />$918-00
<br />15
<br />Sign and Post, Remove & Reset
<br />4
<br />EA
<br />225.010
<br />$1900.00
<br />16
<br />Temporary Erosion Control
<br />1
<br />LS
<br />1,400.00
<br />$1,400.00
<br />17
<br />Temporary Inlet Protection
<br />5
<br />EA
<br />105.00
<br />$525.00
<br />18
<br />Inlet, Type B
<br />2
<br />EA
<br />3,500.00
<br />$7,000.010
<br />19
<br />20
<br />Storm Sewer Pipe, 12 IN
<br />Casting, Adjust to Grade
<br />44
<br />I
<br />LFT
<br />EA
<br />110.00
<br />645.00
<br />$4,840.00
<br />$645,00
<br />21
<br />Water Main,, Ductile Iron, 8 IN
<br />283
<br />LFT
<br />80.00
<br />$22,640.00
<br />22
<br />Water Main, Ductile Iron, 6 IN
<br />15
<br />LFT
<br />140.00
<br />$2,100.00
<br />23
<br />Tapping Valve & Sleeve, 8 IN X 8'IN
<br />1
<br />EA
<br />4,300.00
<br />$4,300-00
<br />24
<br />Gate Valve & Box, 8 IN
<br />I
<br />EA
<br />2,200.00
<br />$2,200.00
<br />25
<br />Fire Hydrant Assembly
<br />1
<br />EA
<br />6,700.00
<br />$6,700.00
<br />26
<br />Water Main Tap
<br />1
<br />EA
<br />7,320.00
<br />$7,320,00
<br />27
<br />28
<br />Compacted Aggregate, No. 53
<br />HMA Patching, FuH Depth, Type B
<br />65
<br />102
<br />TON
<br />TON
<br />68.00
<br />130.00
<br />$4,420.00
<br />$13,260.00
<br />29
<br />HMA Intermediate, Type B
<br />218
<br />TON
<br />99.00
<br />$21,582.00
<br />
|