Laserfiche WebLink
Prepared by: Jones Petrie Rahnski <br />ADDENDUM NO.3 <br />To the Contract Document and Project Specifications for the <br />St. Joseph Streetscape Improvements <br />11( 8-0081 <br />CITY OF SOUTH BEND, INDIANA <br />Date: August 24, 2018 <br />To: All holders of the contract document for the above project. <br />The items in this addendum are to become a part of the original documents as if included therein. Only <br />the noted items are affected, and the remainder of the original contract document is to remain in its <br />entirety. <br />This Addendum modifies the Contract Documents as follows: <br />PART I — CLARIFICATIONS <br />PART 2 — SPECIAL PROVISIONS <br />PART 3 — CONSTRUCTION DOCUMENTS <br />PART I - CLARIFICATIONS <br />1.01 Attached are the meeting minutes from the Pre -bid meeting held on August 21, 2018. <br />PART 2 — SPECIAL PROVISIONS <br />2.01 SPECIAL PROVISIONS, Page 13, Section XX1I, Pre -Construction Video of Site Conditions: <br />1. REVISE Item B, No. 1 to read "The Contractor shall be required to submit a professionally <br />completed DVD recording of the project area to clearly show driveways, street pavements, <br />signs, traffic signals, etc. prior to the start of construction to verify before and after <br />conditions. The DVD shall indicate the date of the recording and also include a method to <br />identify the street or area being videotaped such as stationing or some other unique <br />identifier." <br />2.02 SPECIAL PROVISIONS, Page 19, Section XXXV, Permits: <br />1. DELETE Item B, No. 1 note. <br />2.03 SPECIAL PROVISIONS, Page 19, Section XXXV, Permits: <br />1. DELETE "Part B" callout from Item B, No. 6, a. <br />2.04 SPECIAL PROVISIONS, Page 21, Section XXXIX, Pavement, Remove: <br />1. DELETE "Part B" callout from Item B, No. 4, a. <br />2.05 SPECIAL PROVISIONS, Page 22, Section XL, Structure, Remove: <br />1. DELETE "Part B and C" callout from Item B, No. 4, a. <br />2.06 SPECIAL PROVISIONS, Page 24, Section XLIII, Common Excavation: <br />1. REVISE Item B, No. 12, a, to read "Payment for all costs of "Common Excavation," shall <br />be only for specific neat line volumes as approved by the Engineer for any common <br />excavation required during the work which is not included in any established pay item <br />including the cost of all materials, equipment, tools, labor, transportation, operations, and all <br />other incidentals, shall be paid for on a cubic yard basis for all parts under the pay item" <br />2.07 SPECIAL PROVISIONS, Page 28, Section L, Hot Mix Asphalt Pavement: <br />1. DELETE "Part B and C" callout from Item B, No. 8, a. <br />St. Joseph Streetscape Improvements Addendum #3 <br />August 24, 2018 Page I <br />