BID/PROPOSAL
<br />Project Name: St. Joseph Street Improvements
<br />Project Number: 118-008
<br />For Bids Due: August 28, 2018
<br />Contractor Name: Rieth-Riley Construction Co., Inc.
<br />ALUM
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />I
<br />2
<br />Construction Engineering
<br />Maintaining Traffic
<br />I
<br />I
<br />LS
<br />LS
<br />$ 5,765.20
<br />$ 12,190.10
<br />$ 5,765.20
<br />$ 12,190.10
<br />3
<br />Video Record
<br />I
<br />LS
<br />$ 2,326.24
<br />2,326.24
<br />4
<br />Mobilization and Demobilization
<br />1
<br />LS
<br />$ 45,234.78
<br />45,234.78
<br />5
<br />6
<br />Clearing of Right of Way
<br />Excavation, Common
<br />I
<br />296
<br />LS
<br />CYS
<br />$ 6,68417
<br />$ 69.31
<br />$ 6,684.27
<br />$ 20,5,15.76
<br />7
<br />Surface Milling, Asphalt, 4 IN
<br />1582
<br />SYS
<br />$ 7.97
<br />$ 12,608.54
<br />8
<br />Pavement, Remove
<br />72
<br />SYS
<br />73,09
<br />$ 5,262.48
<br />9
<br />Curb, Concrete, Remove
<br />140
<br />LFT
<br />$ 20.74
<br />$ 2,903.60
<br />10
<br />11
<br />12
<br />Tree Remove
<br />Structure Remove
<br />Light Pole & Foundation, Remove
<br />3
<br />1
<br />3
<br />EA
<br />EA
<br />EA
<br />$ 305,41
<br />$ 1,437.39
<br />$ 417,40
<br />$ 916.23
<br />$ 1,437.39
<br />$ 1,252.20
<br />13
<br />!Handhole Remove
<br />2
<br />EA
<br />$ 285.06
<br />$ 570.12
<br />14
<br />8" VCP Pipe, Remove
<br />51
<br />LFT
<br />$ 34.89
<br />$ 1,779.39
<br />15
<br />Sign and Post, Remove & Reset
<br />4
<br />EA
<br />$ 183.25
<br />$ 733.00
<br />16
<br />Temporary Erosion Control
<br />I
<br />LS
<br />$ 1,781.58
<br />$ 1,781,58
<br />17
<br />18
<br />19
<br />Temporary Inlet Protection
<br />Inlet, Type B
<br />Storm Sewer Pipe, 12 IN
<br />5
<br />2
<br />44
<br />EA
<br />EA
<br />LFT
<br />$ 178.16
<br />$ 3,240.86
<br />$ 113.78
<br />$ 890.80
<br />$ 6,481.72
<br />$ 5,006.32
<br />20
<br />Caisting, Adjust to Grade
<br />1
<br />EA
<br />$ 697.61
<br />$ 697.61
<br />21
<br />Water Main, Ductile Iron, 8 IN
<br />283
<br />LFT
<br />$ 76.94
<br />$ 21,774.02
<br />22
<br />23
<br />Water Main, Ductile iron, 61N
<br />Tapping Valve & Sleeve, 8 IN X 8 IN
<br />15
<br />1
<br />LFT
<br />EA
<br />140.70
<br />6,080.06
<br />$ 2,110.50
<br />$ 6,080.06
<br />24
<br />Gate Valve & Box, 8 IN
<br />1
<br />EA
<br />$ 3,236.08
<br />$ 3,236.08
<br />25
<br />Fire Hydrant Assembly
<br />1
<br />EA
<br />$ 8,821.07
<br />$ 8,821.07
<br />26
<br />Water Main Tap
<br />I
<br />EA
<br />$ 5,026.39
<br />$ 5,02639
<br />27
<br />Compacted Aggregate, No. 53
<br />65
<br />TON
<br />$ 75.05
<br />$ 4,878.25
<br />28
<br />HMA Patching, Full Depth, Type B
<br />102
<br />TON
<br />$ 107.98
<br />$ 11,013.96
<br />29
<br />HIVIA Intermediate, Type B
<br />218
<br />TON
<br />$ 95.44
<br />$ 20,805.92
<br />Version 7/20/2018 Contractor's Bid for Public Works - 7