Laserfiche WebLink
BID/PROPOSAL <br />Project Name: St. Joseph Street Improvements <br />Project Number: 118-008 <br />For Bids Due: August 28, 2018 <br />Contractor Name: Rieth-Riley Construction Co., Inc. <br />ALUM <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />I <br />2 <br />Construction Engineering <br />Maintaining Traffic <br />I <br />I <br />LS <br />LS <br />$ 5,765.20 <br />$ 12,190.10 <br />$ 5,765.20 <br />$ 12,190.10 <br />3 <br />Video Record <br />I <br />LS <br />$ 2,326.24 <br />2,326.24 <br />4 <br />Mobilization and Demobilization <br />1 <br />LS <br />$ 45,234.78 <br />45,234.78 <br />5 <br />6 <br />Clearing of Right of Way <br />Excavation, Common <br />I <br />296 <br />LS <br />CYS <br />$ 6,68417 <br />$ 69.31 <br />$ 6,684.27 <br />$ 20,5,15.76 <br />7 <br />Surface Milling, Asphalt, 4 IN <br />1582 <br />SYS <br />$ 7.97 <br />$ 12,608.54 <br />8 <br />Pavement, Remove <br />72 <br />SYS <br />73,09 <br />$ 5,262.48 <br />9 <br />Curb, Concrete, Remove <br />140 <br />LFT <br />$ 20.74 <br />$ 2,903.60 <br />10 <br />11 <br />12 <br />Tree Remove <br />Structure Remove <br />Light Pole & Foundation, Remove <br />3 <br />1 <br />3 <br />EA <br />EA <br />EA <br />$ 305,41 <br />$ 1,437.39 <br />$ 417,40 <br />$ 916.23 <br />$ 1,437.39 <br />$ 1,252.20 <br />13 <br />!Handhole Remove <br />2 <br />EA <br />$ 285.06 <br />$ 570.12 <br />14 <br />8" VCP Pipe, Remove <br />51 <br />LFT <br />$ 34.89 <br />$ 1,779.39 <br />15 <br />Sign and Post, Remove & Reset <br />4 <br />EA <br />$ 183.25 <br />$ 733.00 <br />16 <br />Temporary Erosion Control <br />I <br />LS <br />$ 1,781.58 <br />$ 1,781,58 <br />17 <br />18 <br />19 <br />Temporary Inlet Protection <br />Inlet, Type B <br />Storm Sewer Pipe, 12 IN <br />5 <br />2 <br />44 <br />EA <br />EA <br />LFT <br />$ 178.16 <br />$ 3,240.86 <br />$ 113.78 <br />$ 890.80 <br />$ 6,481.72 <br />$ 5,006.32 <br />20 <br />Caisting, Adjust to Grade <br />1 <br />EA <br />$ 697.61 <br />$ 697.61 <br />21 <br />Water Main, Ductile Iron, 8 IN <br />283 <br />LFT <br />$ 76.94 <br />$ 21,774.02 <br />22 <br />23 <br />Water Main, Ductile iron, 61N <br />Tapping Valve & Sleeve, 8 IN X 8 IN <br />15 <br />1 <br />LFT <br />EA <br />140.70 <br />6,080.06 <br />$ 2,110.50 <br />$ 6,080.06 <br />24 <br />Gate Valve & Box, 8 IN <br />1 <br />EA <br />$ 3,236.08 <br />$ 3,236.08 <br />25 <br />Fire Hydrant Assembly <br />1 <br />EA <br />$ 8,821.07 <br />$ 8,821.07 <br />26 <br />Water Main Tap <br />I <br />EA <br />$ 5,026.39 <br />$ 5,02639 <br />27 <br />Compacted Aggregate, No. 53 <br />65 <br />TON <br />$ 75.05 <br />$ 4,878.25 <br />28 <br />HMA Patching, Full Depth, Type B <br />102 <br />TON <br />$ 107.98 <br />$ 11,013.96 <br />29 <br />HIVIA Intermediate, Type B <br />218 <br />TON <br />$ 95.44 <br />$ 20,805.92 <br />Version 7/20/2018 Contractor's Bid for Public Works - 7 <br />