My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Spec S - One or More 2018 or Newer Emergency Medical Vehicle - Fire Service Inc - Part 1
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Spec S - One or More 2018 or Newer Emergency Medical Vehicle - Fire Service Inc - Part 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 11:51:13 AM
Creation date
8/30/2018 9:12:56 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/28/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND <br />CHASSIS: <br />3.5 CHASSIS MANUFACTURER AND MODEL YEAR <br />The chassis shall meet the requirements of this specification. It shall be a 2020 <br />Freightliner M2. <br />3.6 MODEL PHYSICAL CHARACTERISTICS <br />Model: M2 106 Conventional Chassis <br />Please refer to the Frcightliner Special Order Chassis Specification within this <br />document. <br />Also, of note; your request for the engine/transmission combo was not able to be <br />accommodated. We are providing an alternate that exceeds the requirements of <br />your request. <br />Bellows, Passthru, Uniarip. Frelmhtliner, Std <br />CAB PATIENT COMPARTMENT <br />The modular body shall be attached to the cab chassis by means of a rubber <br />bellows with one hundred and fifty square inches of open viewing area. <br />2020 Base, Freightliner.170" Module, Standard Model 2018-2 <br />Switch, (1). Momentary, Dump <br />SWITCHING <br />A Momentary Dump switch shall be installed as directed by this Agency. <br />Air Suspension, OEM, Installed, Frtin <br />AIR SUSPENSION SYSTEM <br />An OEM air suspension system shall be ordered with the chassis. The ambulance <br />manufacturer shall install (1) dump switch. The suspension shall lower the <br />modular box only when the vehicle is put in neutral and park brake is set.. There <br />shall be an OEM air gauge in the dash of the chassis. <br />Cover, Fuel Tank, Diamond Plate, w/(2) Steps, M2 <br />10083-0016 08/27/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.