My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to PSA - EPOCH Architecture - VPA Restroom Remodel Design Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Amendment to PSA - EPOCH Architecture - VPA Restroom Remodel Design Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:25:11 AM
Creation date
8/30/2018 8:29:00 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/28/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated May 8, 2018. <br />AMENDMENT TO OWNE, R-F NGINEI ER AGREEMENT <br />Amendment No. 1_ <br />I . Background Data: <br />a. Effective Date of Owner -Engineer Agreement: May 8, 2018 <br />b. Owner; Board of Public Works, City of South Bend <br />G. Engineer; Epoch Architecture + Planning <br />& project; Park Restrooms <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services; <br />1) Evaluate existing electrical facilities at each park restroom being renovated for the <br />addition of electrical hand dryers. Select appropriate products and produce <br />construction documents for the band dryer installations. Where existing electrical <br />panels are not able to be modified, either the panel will be noted to be replaced or an <br />extension panel will be added next to the panel to hold the new breakers for the <br />hand dryers, The installation of hand dryers relates to accessibility by eliminating <br />the need for loose trash cans in the restroom which could block access to fixtures or <br />the door of the restroom. The change will also reduce the maintenance staff time to <br />service the restrooms. <br />2) Design and produce construction documents for site accessibility improvements at <br />six (6) additional sites found to be out of compliance with ADA requirements: <br />Those parks are Potawatomi, Boelhln, Boland, Southeast Neighborhood, Rum <br />Village and Leeper Parks. <br />3) All items listed above will be incorporated into the project drawings that have been <br />developed under the original agreement and bid at the same time. <br />b. The schedule for rendering services is modified as follows; Additional one month will. <br />be added to the originally agreed upon schedule for Construction Documents and <br />approximately one month will be added to the expected construction period requiring <br />Architect observation. <br />Page I <br />(Exhibit IC— (Antendnient to Otwner-Ekigineer Agreentenl)— Attachment 1) <br />EJC➢C E-500 Agreement Betwecn Owner and Engin"r forProfessional Services, <br />Copydght O 2008 National Society of Yrofessionl Engineers for 1+:,1C1DC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.