Laserfiche WebLink
This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated May 8, 2018. <br />AMENDMENT TO OWNE, R-F NGINEI ER AGREEMENT <br />Amendment No. 1_ <br />I . Background Data: <br />a. Effective Date of Owner -Engineer Agreement: May 8, 2018 <br />b. Owner; Board of Public Works, City of South Bend <br />G. Engineer; Epoch Architecture + Planning <br />& project; Park Restrooms <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services; <br />1) Evaluate existing electrical facilities at each park restroom being renovated for the <br />addition of electrical hand dryers. Select appropriate products and produce <br />construction documents for the band dryer installations. Where existing electrical <br />panels are not able to be modified, either the panel will be noted to be replaced or an <br />extension panel will be added next to the panel to hold the new breakers for the <br />hand dryers, The installation of hand dryers relates to accessibility by eliminating <br />the need for loose trash cans in the restroom which could block access to fixtures or <br />the door of the restroom. The change will also reduce the maintenance staff time to <br />service the restrooms. <br />2) Design and produce construction documents for site accessibility improvements at <br />six (6) additional sites found to be out of compliance with ADA requirements: <br />Those parks are Potawatomi, Boelhln, Boland, Southeast Neighborhood, Rum <br />Village and Leeper Parks. <br />3) All items listed above will be incorporated into the project drawings that have been <br />developed under the original agreement and bid at the same time. <br />b. The schedule for rendering services is modified as follows; Additional one month will. <br />be added to the originally agreed upon schedule for Construction Documents and <br />approximately one month will be added to the expected construction period requiring <br />Architect observation. <br />Page I <br />(Exhibit IC— (Antendnient to Otwner-Ekigineer Agreentenl)— Attachment 1) <br />EJC➢C E-500 Agreement Betwecn Owner and Engin"r forProfessional Services, <br />Copydght O 2008 National Society of Yrofessionl Engineers for 1+:,1C1DC. All rights reserved. <br />