Laserfiche WebLink
Exhibit A <br /> PROJECT DESCRIPTION <br /> The Project consists of upgrades, expansions, additions, replacements, extensions and <br /> improvements to the Waterworks, including: <br /> Distribution S, s�� <br /> 1. Replace water main on South Bend Avenue from Twyckenham Avenue to Eddy Street <br /> 2. Replace water main on Ewing Avenue from Locust Road. to Walnut Street <br /> 3. Install water main on Bailey Avenue to Burdette Street to supply Legacy Court <br /> 4. Install water main to connect South Well field to the South Pressure Zone <br /> 5. Install a water main under the railroad tracks on 30th Street <br /> 6. Install a new well at the Cleveland Road North well field <br /> 7. Modify pressure reducing valves <br /> Other projects <br /> 1. Acquire additional automated meter reading meters <br /> 2. Acquire hydro-excavation truck for water system repairs <br /> 3. Security upgrades to water facilities including technology <br /> Pinhook U�grade <br /> 1. Improve chemical feed system <br /> 2. Replace filter media for greater filtering capacity <br /> 3. Aerator removal and detention tank modification <br /> 4. Improve metering applications <br /> 5. Replace existing high service pumps and drives <br /> 6. Upgrade filter equipment <br /> 7. HVAC system renovation <br /> Making any and all additional improvements related to the foregoing. <br /> SBDS02 ABF 425947v5 <br />