Laserfiche WebLink
tinued. <br />Pa vement on Main Street. <br />Bid of Williston Construction Companyo <br />walk per.sq. ft. <br />curb' per lin ft. . <br />° Grac ing per cu. yd. <br />Asphalt panment' using Mexican pper sq. yd. <br />Asphalt pavement using Trinidad per sq. yd. <br />Manholes per ft. <br />Manholes tops end covers, each <br />Asphaltic concrete Mexican per sq. yd.. <br />Asphaltic concrete Trini"d Davement per sq. yd. <br />8 inch conduit pipe per lin ft. <br />Storm water unlets, each <br />Marginal curb per lin ft. <br />Resetting inlets, each <br />Resetting manhole covers, each <br />Check <br />Bid of The White Construction Co. <br />walk per sq. ft. <br />to be reported <br />curb per lin ft. <br />Grading per cu. yd. <br />Sheet asphalt Yrinidad per . sq. yd. <br />aheet.asphalt '°-exican per sq. yd. <br />Lin. feet of manholes per lin ft. <br />Manhols curbs and covers, each <br />Asphaltic concrete Mexican per sq. yd. <br />Asphaltic concrete Trinidad per•sq. yd. ° <br />8 inch conduit'pipe per lin ft. <br />Storm water inlets, each <br />Marginal curb per lin ft. <br />Resetting inlets, each <br />Resetting manhole ;covers, each <br />All -of -the above bids were referred to the <br />on Wednesday .July 5th., 1922 at 9:00 A.M. <br />060 <br />3.070 <br />10.50 <br />18.400 <br />2. 7 <br />.95. <br />14.50 <br />..40 <br />3.00 <br />3.00 ^ <br />.20 <br />.50 <br />.95 <br />3.10 <br />2.85 <br />10.00 <br />18.00 <br />2.50 <br />2.70 <br />1.00 <br />12.50 <br />.40. <br />.00 <br />3.00 <br />City Engineer for tab _uation <br />D C. La ton, Street Commission r re uPsted permission to purchase <br />Ford. Runabout for the ftreet Department at Price of480.00 Same granted by the Board. <br />Engineers filed esttmated costs of improcerlents as foilowings: <br />Estimted cost of Widening and avina of La Salle .Avenue from <br />St. Joseph River to Vilest line of Main Street at.........15,292.00 <br />Estimated cost of Pavement on East Madison Street from <br />-Eddy S r et to E. Line of Judie's Addition at.....&*$24,234.,00 <br />Estimated cost, of pavementon alley Dying between Riverside <br />Drive -and Woodward Avenue from Golden Avenue to Vassar Avenue at .... $2,g09.00 <br />Pole and Wire inspector reports it not.necessary to place <br />light at corner of Anthony Street and Ford Stte6t. petition 'filed. <br />Petition filed for concrete pavement on the first alley <br />west of Lafayette Street from Marion Street to I dison Street. Resalution ordered. <br />Remonstrance filed �gainst grade, curb and walk on Randolph <br />Street from Marine Street to Leer Street. Same filed. <br />Estimated cost of Grade, curb and walk on Fourth Street from <br />Mishawaka Ave7mue to the first-alleu south of Vine Street at ..... $4,093.00 <br />Claims were approved'as follows: - <br />Building Dept., p475.00 <br />Engineering Dept., 843.32 <br />Geo. A. Davis 30.00 <br />F. J. Anderson 60.00 <br />s <br />Preside of Board. <br />