My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/27/1922 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1922
>
06/27/1922 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 1:20:18 PM
Creation date
8/22/2018 1:17:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
6/27/1922
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />Board met in regular session at 9:00 A.M. All menbers present. <br />Bids were received opened and read on the following improvements. <br />_Pipe sewer on O'Brien Street. <br />Bid of Geo. A. Harrop . <br />12 inch sewer, per lin ft........... <br />10 inch sewer, per lin ft' <br />8 inch sewer, per lin ft. <br />6 inch sewer, per lin ft. <br />Manholes per ft. in depth <br />Manholes,_ curbs and covers, each <br />Storm water inlets, each <br />Check U00'.00 <br />Bid of Joe. A Luther. <br />12 inch pipe sewer, per lin ft. <br />10 inch pipe sewer, per lin ft. <br />8 inch pipe sewer, per lin ft. <br />6 inch pipe sewer, per lin ft. <br />Manholes per ft. <br />Manholes curbs and covers, each <br />Storm water inlets <br />Check $122.00 <br />Bid of Hoban & Roach <br />$2.45 " <br />2.00 <br />.70 <br />1.00 <br />6.00 <br />18.00 <br />10.00 <br />2.6o <br />2..00 <br />1.00 <br />.95 <br />10.00 <br />18.00 <br />10.00 <br />12 inch pipe <br />sewer, <br />per lin <br />ft. <br />3-.20 <br />10 inch pipe <br />sewer, <br />per lin <br />ft. <br />3.00 <br />8 inch pi a <br />sewer, <br />per lin <br />ft. <br />.75 <br />6 inch pipe <br />sewer, <br />per lin <br />ft. <br />1.25 <br />Manholes per <br />ft. <br />8.00 ' <br />Manholes curbs <br />and <br />covers, each <br />17.00 <br />Storm water <br />inlets, <br />each <br />10.00 <br />Check $100.00 <br />Bid of Bruno De Palepe <br />12 inch pipe <br />sewer, <br />per lin <br />ft. <br />2.45 <br />.10 inch pipe <br />sewer, <br />per tin <br />ft. <br />2.30 <br />8 inch pipe <br />sewer, <br />per lin <br />ft. <br />1.00 <br />6'inch pipe <br />sewer, <br />per lin <br />ft. <br />1.00 <br />Manholes per <br />ft. <br />6.60 <br />M*nholes curbs and <br />covers, <br />each <br />17.00 <br />Storm water <br />inlets, <br />each <br />10.00 <br />C heck 4122.00 <br />Pavement on alley in Mease Addition. <br />Bid of Hoban & Roach. <br />Grading per cu. yd. <br />7 inch concrete per sq. yd. <br />Check $100.00 <br />Grade curb and walk on Eckman Street. <br />Bid of Heim Construction Company. <br />walk per sq. ft. <br />curb per lin ft. <br />Grading per cu. yd. <br />Bid of H. N. Barnes. <br />Walk per sq. ft. <br />Curb per lin ft. <br />Grading,per cu yd. <br />Bid of Highways Material Co.. <br />Walk per sq. ft. <br />.curb per lin ft. <br />Grading per cu. yd. <br />Check 0100.00 <br />1,25 <br />2.50 <br />.13 <br />.32 <br />.65 <br />.30 <br />.6o <br />Check $100;00 <br />.13 <br />♦♦ ` 30 <br />.65 <br />Check,$200.00 <br />Grade] curb and walk on Bergan Street. <br />Bid of H. N. Barnes. <br />Walk per sq, ft. .13 <br />Curb per lin ft. ,28 <br />Grading per cu. yd. .50 <br />Check 1100.00 <br />Bid of Highways Materials Co. <br />Walk per sq. ft. .12 <br />Curb per lin ft, •30 <br />Gradin per cu yd. .60' <br />6 <br />Check $200.,00 <br />All bids were referred to the City Engineer for tabulation to <br />be reported on Wednesday June 28th.1-1922 at 7:15 P.M. <br />
The URL can be used to link to this page
Your browser does not support the video tag.