Laserfiche WebLink
4. ESTIMATE OF INFRASTRUCTURE COSTS AT TRANSPO SITE <br /> The Howard Park Neighborhood Master Plan calls for infrastructure improvements at the <br /> former Transpo site to enable the proposed residential development on the 10 acre site. The <br /> plan calls for new roadway development, new alleys, sidewalk, decorative street lighting <br /> and landscaping to enhance the appeal of the neighborhood. The following is an estimate <br /> of the infrastructure costs: <br /> Total Iength of roadway: 5,200 Ll~T <br /> Total length of new alleys: 2,600 LFT <br /> ITEMS ESTIMATED COST <br /> Curb $312,000 <br /> Sidewalk $184,000 <br /> Street Paving/Construction $110,000 <br /> Alley Paving f Construction $58,000 <br /> Decorative Lighting $410,000 <br /> New Landscpaing/Restoration $100,000 <br /> ROW Services (Survey/Platting) $85,000 <br /> Total $1,259,900 <br /> Contingency(20%) $251,980 <br /> Grand Total $1,511,880 <br />