My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4729-18 Adopting and Approving written Fiscal Plan for the South Bend Chocoloate Annexation Area
sbend
>
Public
>
Common Council
>
Legislation
>
Resolutions/Special Resolutions
>
2018
>
4729-18 Adopting and Approving written Fiscal Plan for the South Bend Chocoloate Annexation Area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2018 10:35:33 AM
Creation date
8/17/2018 10:35:27 AM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Resolutions
City Counci - Date
8/13/2018
Ord-Res Number
4729-18
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Chocolate Annexation Area 6 <br /> SECTION III. MUNICIPAL SERVICES <br /> A. Public Works <br /> Sewer - The nearest sanitary sewer to the west originates at the existing lift station near US <br /> 20 and Poppy Road. The City is currently designing a sewer extension that will run along the <br /> south side of US 20 from the northwest corner of the Annexation Area to the lift station. The <br /> lift station has sufficient capacity to accept flows from the Annexation Area. <br /> Development of the site requires City approval of a drainage plan that meets the City's <br /> requirement to store on site all runoff from developed areas. Connection to the City storm <br /> sewer is not permitted. <br /> Water-The South Bend Water Works currently has a 16" water main that runs on the north <br /> side of US 20 from Olive Road to Pine Road. This water main would provide sufficient capacity <br /> for the Annexation Area. The petitioner would likely need to connect to the water line by <br /> boring under US 20. A 12" water main is located along the west side of Pine Road. The <br /> petitioner may wish to connect to both water mains to provide redundancy to the project site. <br /> Extensions of, or taps into sanitary sewer and water lines shall be governed by state law and <br /> the rules and regulations of the South Bend Water Works and Sewer Utility. The Annexation <br /> Area may be subject to system development charges for both water and sewer services. <br /> Street Lighting - Street lighting is provided along US 20 (Lincolnway West) within the <br /> Annexation Area. Should any additional lighting be necessary, street lighting on wood poles <br /> with overhead wiring can be provided through an ongoing contract with Indiana Michigan <br /> Power. If the developer wishes to construct and dedicate additional street lighting, especially <br /> of a decorative nature or with underground wiring, the City may accept it for maintenance and <br /> operation, supported by property tax revenue. <br /> Waivers of Annexation - No waivers of right to remonstrate against annexation are in effect <br /> for this area. <br /> Streets - No new public streets are proposed with this annexation. The annexation would add <br /> a portion of US 20 (Lincolnway West) to the city limits, but US 20 will continue to be <br /> maintained by the Indiana Department of Transportation following annexation. If the project <br /> site is accessed at the US 20-Olive Road intersection, INDOT may require the petitioner to <br /> make improvements there and to the adjoining on and off ramps at the US 20-St. Joseph <br /> Valley Parkway (Bypass) interchange. Depending on the location of access to the project site, <br /> a City Curb Cut Application or INDOT permit will be required for any new driveway approaches. <br /> The petitioner would be responsible for installing sidewalks along public streets as the project <br /> develops. <br />
The URL can be used to link to this page
Your browser does not support the video tag.