Laserfiche WebLink
Tuesday <br />April 25th., 1922. Continued. <br />73 <br />a <br />The, following estim ted costd �tere,prepented by the City Engineer, <br />read and placed on file. " <br />Pavement <br />Paeenon+igeLeeLmnetId�at��.: at"�3�631500rfrom8rAvenue o Indiana <br />VrinsaS <br />00 <br />Pavement on Ale�.south Of Divisi-an Ot, ftom Lafayette to Franklin <br />a t............-....1,922.00 <br />Pipe sewer on Rush Street from Indiana to Haney at............ 270.00 <br />Grade curb and walk on Anderson Avenue. <br />1 * 163.00 <br />Grade, curb and walk on Hill'Street. <br />60293.00 <br />Grade, curb and walk on Ruskin St. <br />787.00 <br />-Bids were received opened and read-on.fdllowing improvements. <br />north <br />P Bement on ichi Street from a oint 40 feet <br />Line of Fairview venue to the sot line of Donmoya Avenue. <br />north of the <br />-Bid of <br />Williabon Construction Company. <br />Cement curb per lin ft. <br />$ 35 <br />Grading per cu. yd. <br />AsphalT-pavement using Trinidad per sq. yd. <br />.85 <br />2.88 <br />_ Asphalt pavement using Mexican per sq. yd. <br />2.62 <br />- <br />Extra concrete per sq. yd. <br />20.00 <br />Brick pavement in car track per sq. yd. <br />4.10 <br />Cement filler in car track add. per sq. yd. <br />.20 <br />Asphalt filler in car track add. per sq, yd. <br />.30 <br />For -concrete pavement using !rinid per sq. yd. <br />2.58 <br />For as�paltic concrete pavement using ":Mexican per sq.. yd $2.33 <br />8 inch conduit pipe per lin ft'. <br />,90 <br />Storm water inlets each <br />14.00 <br />Marginal curb per lin ft. <br />,35 <br />Resetting inlets, each <br />3.00 <br />Resetting manhole covers, each. <br />3.00 <br />' Check <br />Bid of <br />Harry N. Barnes. <br />A.Brick.pavement on a gravel foundation and a sand <br />filler. <br />Cement tdlk per sq. pd. <br />$.20 <br />Cement curb per lin ft. <br />.40 <br />Grading per cu. yd. <br />.90 <br />Veedersburg Block per sq, yd. <br />2.75 <br />Extra concrete per cu. yd, under car track. <br />15.00 <br />For asphalt filler add per sq. yd. <br />.20 <br />Metrolitan Block per sq. yd. <br />. <br />3.00 <br />concrete pavement per sq. yd. <br />2 36 <br />8 inch conduit pipe per lin ft, <br />.80 <br />Storm water inlets, complete <br />10.00 <br />' Marginal curb pair lin ft. <br />.20 <br />Resetting inlets,,each <br />2.00 <br />Resetting manhole covers, each <br />2.00 <br />Bid of <br />the White Construction Company. <br />Cement w41k per sq. ft. <br />.20 <br />Cement curb per lin ft. <br />.50 <br />Grading per cu. yd. <br />- ,90 <br />Sheet asphalt pavement using Trinidad per sq. yd.. <br />2.70 <br />Sheet asphalt pavement using Mexican per sq. yd. <br />2.45 <br />Comhinationcurb and gutterper sq, yd. <br />.90 <br />Extra concrete filler per cu. yd under street <br />car tracks <br />10.00 <br />Brick per sq. yd. 1 inch sand cushion with bituminous <br />filler on six inch base in Street Ry, <br />Tracks. <br />3.20 <br />Asphalt concrete pavement using Mexican per sq. yd. <br />2.10 <br />Asphaltic concrete pavement using Trinidad per sq. <br />yd.2.35 <br />8 inch conduit pipe per lin ft. <br />.90 <br />Storm water.inlets complete <br />12.50 <br />Marginal curb per lin ft, <br />.40 <br />Resetting inlets, each <br />3.00 <br />Resetting manhole covers, each <br />3.00 <br />