My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/18/1922 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1922
>
04/18/1922 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 12:08:44 PM
Creation date
8/16/2018 3:08:17 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/18/1922
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
61 <br />Tuesday April 18th.9 1922. Continued. <br />Pavement on Sunnyside Avenue and Washington <br />Avenue. <br />Bid of Hoban & Roach. <br />Curbin der lin ft. <br />.30 <br />Seven 7 ) inch concrete pavement per sq. yd <br />2.40 <br />Grading per cu. yd. <br />1.00 <br />81neh conduit pipe-per-lin ft. <br />.60 <br />Storm water inlets, each <br />9.00 <br />Resetting inlets, each. <br />.00 <br />Resetting manhole covers, each. <br />3.00 <br />' Cheek $235.00 <br />Bid of Western Construction Co. <br />cement curb per lin ft. <br />.55 <br />Grading per cu. 1 <br />.95 <br />Trinidad Sheet Asphalt pavement per sq. Ord. <br />2.90 <br />Asphaltic concrete Trinidad Lake per eq. yd. <br />2. <br />& inch conduit pipe per lin ft. <br />.85 <br />_ Storm grater inlets, each. <br />12.00 <br />Marginal curb per lin ft. <br />.35 <br />Resetting ihlet;s, each. <br />2.50 <br />Resetting manhole covers, each. <br />2.50 <br />-Check for $235.00 <br />The White Construction. Co. <br />'walk per sq. ft. <br />.20 <br />curb per lin ft. <br />.50 <br />Grading per cu. y,d.: <br />.75 <br />Sheet Asphalt, Trinidad Lake per sq. yet. <br />2.55 <br />Sheet Asphalt, Mexican Asphalt per sq. yd. <br />2.30 <br />Combination curb and gutter <br />.85 <br />Asphaltic concrete Mexican per'sq. yd. <br />1.95 <br />Asphaltic concrete Trinidad per sq., yd, <br />2.20 <br />Q inch conduit pdr lin ft. <br />.90 <br />Storm water.inlets, each. <br />12.50 <br />Marginal curb per lin ft. <br />.40 <br />Resetting inlets, each. <br />3.00 <br />Resetting manhole covers, each <br />3.00 <br />Check $235.00 > <br />Bid of Williston Construction Company. <br />Walk per -sq. ft. > <br />.50 <br />curb per lin ft. <br />.80 <br />Grading per cu. yd. <br />.80 <br />' <br />Asphalt using Mexican per sq. yd. <br />2.79 <br />Asphalt using Trinidad per sq. yd. <br />2.99 <br />The figures hereon are based on the bonds which <br />are <br />issued <br />In payment for the work being serial bonds. If <br />bonds <br />are issued <br />in odd amounts against*indivlduals lots add 3% to these prices. <br />Asphaltic concrete pavement using Mexican per <br />sq. yet. <br />$2.56 <br />Asphaltic concrete pavement using Trinidad per <br />sq. yd 2.75 <br />8 inch conduit pipe, per lin ft..... <br />.90 <br />Storm water inlets, each. <br />14.00 <br />Marginal curb per lin ft. <br />.35 <br />Resetting inlets, each. <br />3.00 <br />Resetting manhole covers, each. <br />3,00, <br />Check>$235.00 <br />Bid of Geo. A. Harrop. > <br />Walk per sq. ft. <br />.20 <br />curb per lin ft. > <br />.30 <br />grading per cu. yd. <br />.80 <br />Concrete pavement per sq. yd. > <br />2.40 <br />8 inch conduit pipe per lin ft. <br />.80 <br />Storm water inlets, each. <br />15.00 <br />Marginal curb per lin ft. <br />.20 <br />Resetting inlets, each. <br />5.00 <br />Resetting manhole -covers, each. <br />5.00 > <br />Check $400.00 <br />Bid of Nees & Brown. <br />curb 4" X 12" per lin ft. <br />.40 <br />cement curb 6 X 7 X 16 per lin ft. <br />,.50 <br />Grading per cu, yd. <br />.75 <br />Concrete pavement per sq* yd. <br />2.50 <br />8 inch conduit pipe per lin ft. <br />.70 <br />Storm vaster inlets, each. <br />40.00 <br />Marginal curb per lin ft. <br />.40 <br />Resetting manhole covers, each <br />15.00 <br />Resetting inlets, each. <br />10.00 <br />Check $250.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.