Laserfiche WebLink
responsibilities, and authority of Engineer as an attachment to this Exhibit B that is to be mutually <br />agreed upon and made a part of this Agreement before such services begin. <br />O. Attend the pre -bid conference, bid opening, pre -construction conferences, construction progress <br />and other job related meetings, and Substantial Completion and final payment visits to the Project. <br />P. Provide the services of an independent testing laboratory to perform all inspections, tests, and <br />approvals of samples, materials, and equipment required by the Contract Documents, or to <br />evaluate the performance of materials, equipment, and facilities of Owner, prior to their <br />incorporation into the Work with appropriate professional interpretation thereof. <br />Q. Provide Engineer with the findings and reports generated by the entities providing services to <br />Owner pursuant to this paragraph. <br />R. Inform Engineer in writing of any specific requirements of safety or security programs that are <br />applicable to Engineer, as a visitor to the Site. <br />S. Perform or provide the following additional services: `Here list any such additional Services] <br />Page 3 <br />(Exhibit B--Owner's Respousibilities) <br />EJCDC 1,500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright© 2008 National Society of Professional Gnglueers for CJCDC. All rights reserved. <br />