My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Jones Petrie Rafinski - MPAC Mezzanine Handrails
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Jones Petrie Rafinski - MPAC Mezzanine Handrails
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:31:58 AM
Creation date
8/15/2018 11:08:35 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/14/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. Services during the Construction Phase rendered after the original date for completion of <br />the Work referred to in A1.05.B. <br />8. Reviewing a Shop Drawing more than three times, as a result of repeated inadequate <br />submissions by Contractor. <br />9. While at the Site, compliance by Engineer and its staff with those terms of Owner's or <br />Contractor's safety program provided to Engineer subsequent to the Effective Date that <br />exceed those normally required of engineering personnel by federal, state, or local safety <br />authorities for similar construction sites. <br />Page 5 <br />(Exhibit A — Engineer's services) <br />EJCDC E-500 Agreement Between Owner arid Engineer for Professional Services <br />Copyright © 2003 National Society of Professional Engineet's for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.