Laserfiche WebLink
McCormick Engineering, LLG. <br />234 N, Ironwood Der. <br />South Bend, IN 46615 <br />MEL Project No. 01673 <br />Tabulation of Bids <br />City of South Bend Board of Public Works <br />Miami Basin Drainage Improvements Project <br />City Project No, 116-082C <br />Bids Open Date: July 24, 2018 <br />HRP Construction, Inc. <br />Relih Riley Construction Co. <br />Engineer's Estimate <br />Item <br />Description <br />Unit <br />Quantity <br />Unit Price Total Amount <br />Unit Price Total Amount <br />Unit Price Total Amount <br />No. <br />1 <br />Mobilization and Demobilization <br />LS <br />1 <br />$ 24,723.56 <br />24,72156 <br />$ 166,125.00 <br />$166,125.00 <br />$ 20,400 <br />$ 20,400,00 <br />-- ----------------------- <br />—$7, 0 0 0 �- 0-0 <br />7--, 0-0-0. 0- 0 <br />$-- 8,006.00 <br />$ 8,006,00 <br />--- ----------- <br />$ 5,000 <br />- ----- --- <br />$ 5,000.00 <br />—,- <br />------- <br />3 <br />................................ <br />Tree, Remove <br />EACH <br />7 <br />$ 400.00 <br />$ 2,800.00 <br />$ 867,00 <br />I- I <br />$ 6,069.00 <br />— r r rr - — <br />$ 300 <br />-------- --.— <br />$ 2,1K00 <br />—1 <br />4 <br />Gate, Remaue <br />EACH <br />2 <br />$ 7%00 <br />$ 1,500,00 <br />$ 255.00 <br />$ 610.00 <br />$ 500 <br />$ 1,000.00 <br />5 <br />------------------------------------------------------------- <br />Concrete Drive, Remove <br />EACH <br />------------- <br />2 <br />$ 1,000.00 <br />$ 2,000.00 <br />$ 1,733.00 <br />$ 3,466,00 <br />$ 1,000 <br />$ 2,000.00 <br />- ------- <br />6 <br />------ - ----- - ------ <br />Sidewalk, Remove <br />SYS <br />95 <br />$ 15.00 <br />$ 1.425.00 <br />$ 16.00 <br />$ 1,520,00 <br />$ 30 <br />$ 2,850,00 <br />7 <br />Cutb, Remove <br />LFT <br />183 <br />$ 20.00 <br />$ 3,660.00 <br />$ 11.00 <br />$ 2,013,00 <br />$ 35 <br />$ 6,405.00 <br />8 <br />Excavation, Common <br />CYS <br />280 <br />$ 70.00 <br />$ 19,600.00 <br />$ 49.00 <br />$ 13,720.00 <br />$ 40 <br />$ 11. 200, 00 <br />9 <br />Borrow <br />CYS <br />710 <br />$ 40.00 <br />28,400,00 <br />$ 51.00 <br />$ 36,210.00 <br />$ 60 <br />-- ----- ------ <br />$ 42,600,00 <br />10 <br />125,00 <br />$ 78�750.00 <br />$ 75 <br />$ 47,250X0 <br />- ------- <br />11 <br />-------- ---- - ------ <br />Water Quality Structure Maintenance <br />- <br />EACH <br />3 <br />$ 1,200.00 <br />$ 3,600.00 <br />$ 1,020.00 <br />$ 3,060.00 <br />$ 5,000 <br />$ 15,000'00 <br />12 <br />I <br />CYS <br />242 <br />$ 45�00 <br />$ 10,890�00 <br />$ 54.00 <br />$ 13,068.00 <br />$ 60 <br />$ 12,100,00 <br />13 <br />-- ----------------------------------- <br />No, 2 Stone <br />TON <br />140 <br />. ..... <br />$ 65.00 <br />$ 9,10�0.00 <br />$ 18 00 <br />$ 2,520,00 <br />$ 40 <br />$ 5,600.00 <br />14 <br />.... . ..... . . . ..... . ...... <br />Temporary Seeding <br />... <br />$ 0,90 <br />$ 6,534�00 <br />$ 0.33 <br />— <br />$ 2,395.80 <br />--------- <br />$ 0.4 <br />$ 2,904,00 <br />15 <br />Temporary Silt Fence <br />LET <br />540 <br />$ 2,50 <br />$ 1,350.00 <br />$ 2.00 <br />$ 1,080.00 <br />$ 2 <br />--------------- <br />$ 1,080.00 <br />_..... <br />16 <br />-- ---------------_.-A ---- - ----- - - - ----- - --- <br />6 eotextile for Subgrade, Type 1A <br />SYS <br />1,320 <br />$ 2.50 <br />$ 3,300�00 <br />$ 6.00 <br />$ 7,920.00 <br />$ 2 <br />$ 2,640.00 <br />------------- <br />Compacted Aggregate, No 53 <br />---------- <br />TON_ <br />------------ - <br />360 <br />$ 50.00 <br />$ 113,000.00 <br />$ 41.00 <br />$ 14,760.00 <br />$ 45 <br />$ 16,200.00 <br />--1-7--. <br />18 <br />HMA Patching, Type A <br />TON <br />17 <br />$ 250.00 <br />4 2 <br />$ 4,260.00 <br />$ 326.00 <br />$ 5,542.00 <br />$ 250 <br />$ 4,250,00 <br />19 <br />F`�r--9 in. <br />Pavement, <br />SYS <br />380 <br />$ 76.00 <br />$ 28,880,00 <br />$ 91,00 <br />$ 34,580.00 <br />$ 80 <br />$ 30,400.00 <br />Gate, Cantilevered, 24' <br />EACH <br />2 <br />$ 2,100.00 <br />2 <br />$ 4,200.00 <br />4 <br />$ 765.00 <br />$ 1,530.00 <br />.. .... .. . ............ - - <br />$ 6,000 <br />$ 12,000,00 <br />21 <br />Sidewalk, Concrete <br />SYS <br />80 <br />$ 54.00 <br />$ 4,320.00 <br />4 <br />$ 8Z00 <br />$ 6,560.00 <br />$ 150 <br />$ 12,000,00 <br />-'ii'Eurb�-and <br />-------------- <br />Gutter, Concrete, Type B <br />---------- <br />LFT <br />----------- <br />110 <br />$ 36�00 <br />3 <br />$ 3,960.00 <br />$ 55.00 <br />$ 6,050.00 <br />$ 60 <br />-- ------------ <br />$ 6,600.00 <br />. .... .. . .... . .. ..... <br />-------- <br />23 <br />------- ----- <br />Curb, Integral, Concrete <br />LFT <br />$ 34.00 <br />$ 3,978.00 <br />$ 52.00 <br />$ 6,084,00 <br />$ 60 <br />-------------- --- <br />$ 7,020.00 <br />------- - <br />24 <br />... . ..... . ........ . ----- <br />Rjprap, Class I <br />- - ----- - -- <br />TON <br />-- - - - --------- <br />366 <br />$ 135.00 <br />$ 49.410.00 <br />$ 103.00 <br />$ 37,698.00 <br />$ 75 <br />$ 27450,00 <br />TON <br />100 <br />$ 100. 00 <br />$ 10,00�0.00 <br />$ 104.00 <br />$ 10,400.00 <br />- <br />$ 60 <br />--------- - -------- - <br />$ 6,000.00 <br />— <br />26 <br />Mulched Seeding, U <br />- ------- - <br />SYS <br />-- - ------------ <br />1,817 <br />------- ---- <br />$ 1.50 <br />$ 2,725�50 <br />$ 1.00 <br />$ 1,817.00 <br />$ 1 <br />$ 1,817.00 <br />-------------27 Sodding <br />-- 9�9 --- <br />-- - -------- 3-5-7- <br />$ 13.42 <br />$ 4,790.94 <br />$ 13.00 <br />$ 4,641,00 <br />22 <br />$ 7,854,00 <br />28 <br />-------- -------------------------- <br />Erosion Control Blanket <br />SYS <br />1,111 <br />$ 2,80 <br />$ 3,110.80 <br />$ 4.00 <br />$ 4,444�00 <br />$ 6 <br />$ 6,666.00 <br />29 <br />Turf Reinforcement Mat <br />- - ----- - - - ----- - ----- <br />SYS <br />---------- <br />706 <br />. ..... . <br />$ 5830 <br />$ 41,44220 <br />... .. . <br />$ 65.00 <br />$ 45,890.00 <br />$ 35 <br />$ 24,710.00 <br />30 <br />Plard, Deciduous Tree, Over 2 IN. to <br />EACH <br />4 <br />$ 576.00 <br />$ 2,300.00 <br />1 $ 612.00 <br />$ 2,44&00 <br />$ 600 <br />$ 2,000.00 <br />2�5 IN, <br />31 <br />-------------- --------------------- ----- <br />Plant, Coniferous Evergreen, 72 IN. to <br />EACH <br />3 <br />650,00 <br />'$ <br />$ 1,950.00 <br />$ 5,86.00 <br />$ 1,758.00 <br />$ 375 <br />$ 1,125.00 <br />96 IN, <br />-------- <br />32 <br />- - - ---------------------------- ------------ <br />Casting, Manhole, Adjust to Grade <br />-------- -- <br />EACH <br />------------- <br />3 <br />. ... ....... .. .. . . <br />$ 400-00i <br />$ 1,200-00 <br />$ 1,643.00 <br />$ 4,929.00 <br />$ 750 <br />$ 2,250.00 <br />33 <br />Permanent Sheet Pile Retaining Wall <br />SET <br />7001 <br />182.15 <br />$127,50�5,00 <br />$ 325,6. 0 <br />227,500.00 <br />$ 100 <br />$ 70,000.00 <br />34 <br />- ----------- --- ---------------------------------------------- <br />Maintenance of Traffic <br />LS <br />----------- <br />1 <br />$ 6,600.00 <br />' $q 6,500-001 <br />$ 4,482.00 <br />$ 4�482,00 <br />$ 10.000 <br />.................. <br />$ 10,000.00 <br />7--beQ <br />35 <br />Delineator Flexible, Type I <br />EACH <br />13 <br />55.00� <br />$ 715.00 <br />$ 56.001 <br />$ 728.00 <br />$ 50 <br />6 <br />TOTAL <br />ggl, <br />iRp/—,/, <br />F $ 4 3, 0 0 . 0 0 <br />o --Fp� <br />aqpk, <br />$768,273.80 <br />$429,121.00 <br />I hereby certify that this is a true representation of the Unit Prices associated With the Bids received on July 24, 2018 <br />for the Miami Basin Drainage improvements. <br />Vr'0 Mcco <br />NO. <br />198003330 <br />STATE OF <br />0. <br />IS, <br />NA, <br />0 <br />w,) <br />David. L. MGCorrmck, PE, DWRE <br />Indiana Prefessmnai Engineer No. 19800330 <br />Date: 7/2612018 <br />