My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to PSA - EPOCH Architecture + Planning - Redesign of SBFD Training Center Classroom Bldg
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Amendment to PSA - EPOCH Architecture + Planning - Redesign of SBFD Training Center Classroom Bldg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:25:17 AM
Creation date
8/15/2018 10:10:36 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/14/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated February 13, 2018. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 1 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: February 13, 2018 <br />b. Owner: Board of Public Works, City of South Bend, IN <br />Engineer: Epoch Architecture + Planning <br />d. Project: South Bend Fire Department Training Center Classroom Building <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />1) Engineer shall redesign the project to include a traditional framing system consisting <br />of wood or metal studs for exterior load -bearing walls. Roof structure will be <br />redesigned for pre-engineered trusses or light gauge metal trusses. The roof will also <br />be redesigned to eliminate the covered walkway area of the project; the connection <br />to the existing building will remain. All furniture will be provided by the owner and <br />excluded from the bid documents. USB cabling for table mounted USB outlets will <br />be excluded from the bid documents. The following shall be listed as an add <br />alternate in the bid documents: <br />a) All gypsum board finishing including but not limited to base trim, corner guards, <br />window sills, painting, taping and sanding, including the gypsum board material <br />for walls and gypsum board ceilings. <br />b) All casework. <br />c) Suspended acoustical ceiling systems including, grid system, lay -in acoustical <br />panels, and suspended acoustical panels. <br />d) Electrical floor boxes will be reduced to ten and listed as an add alternate. <br />e) Training Room AN equipment and wiring. <br />f) Security system rough -ins <br />g) Door proximity card readers and manual keypads. <br />b. The Scope of Services currently authorized to be performed by Engineer in accordance <br />with the Agreement and previous amendments, if any, is modified as follows: <br />1) Provide complete structural design services for "stick -built" wall and roof framing <br />and associated foundations. <br />Page r <br />(Exhibit Kâ (Aniendinent to Owner -Engineer Agreement) â Attachment 1) <br />EJCDC E-500 Agreement liehveen Owner and Engineer for Professional Services. <br />Copyright CO 2008 national Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.