Laserfiche WebLink
Exhibit C, Page 2 of 2 <br />Hansel Center Renovation - Bid Estimate <br />5112/11 update <br />61,000 <br />Alternate 2: Repair Windows, operable lower sash <br />5.12.11 <br />Cal �4!! <br />Budoet Cost <br />1 General Conditions <br />120,000 <br />2 Site Work S Demolition <br />85,000 <br />3 Concrete <br />25,000 <br />4 Masonry <br />52.000 <br />5 Motels <br />28,000 <br />8 Carpentry items <br />36,000 <br />7 Rooting & Canopy <br />46,000 <br />8 Doors b Windows <br />225,000 <br />9 Finishes <br />235,000 <br />10 Specialties <br />16,000 <br />11 Equipment <br />0 <br />12 Furnishings <br />7,100 <br />14 Elevator <br />62.000 <br />15 Mechanical / Plumbing ! Fire Protection <br />400,000 <br />16 Electrical <br />230,000 <br />SLKRWed Alternates: <br />Alternate 1: New Windows <br />61,000 <br />Alternate 2: Repair Windows, operable lower sash <br />Alternate 3: No Furred ulterior wells <br />Alternate 4: Garden Wall Repair <br />20,000 <br />Alternate 5: Cast Iron Fence Repair <br />15,000 <br />Altxnate 6: Demolition Costs <br />87,000 <br />Atiemate 7: Recycling Program for Demo Materials <br />1,043 <br />Other Contractor Fees: <br />Builders Fee ' - <br />123,500 <br />Parf. / Payment Bonds <br />17.700 <br />Subtotal Hard construction costs <br />1.769,943 <br />Construction Contingency (10 %) <br />170,994 <br />Total Preiected Construction Cost Estimate: <br />1,940,937 <br />Associated Project Costs: <br />Bulding Acquisition ' <br />35.1100 <br />Furniture, Fbdures & Equipment (Estimated) <br />0 <br />A!E Design Fees, Initial Report 1 <br />3,804 <br />A/E Design Fees, Schematic Design <br />23,250 <br />AIE Design Fess, Awl Services. SD ' <br />12,010 <br />NE Design Fees. Addl Services, Cost Reduction Study ' <br />7,500 <br />ME Design Fees, Next Phase Detail Design, DD, CD, S. CA <br />137,750 <br />Environmental (SSI 2010 Bid- Mold and Asbestos) <br />104,405 <br />Env. (add110% premium recommended by Greuvogel to rebid) <br />10,441 <br />Environmental (lead abatement @ windows) M <br />10,000 <br />Env. tong. / Grauvogel Fen S Report ' <br />5.360 <br />Env. Eng / Greuvogei Fees (Abatement) <br />10,830 <br />Permit Fees (State CDR) <br />S00 <br />Carnage House Renovation ` <br />0 <br />Landscape ' <br />12,500 <br />Fumishinge/Equip r <br />12,000 <br />Communications ' <br />47,000 <br />Misc. other costs ' <br />32AN <br />Escalation ' <br />69,241 <br />Total Proiect Cost: <br />2,481,291 <br />NOTES: <br />kKW provides for seven WOW (7%) pMM <br />= 2010 Budget had a 7% COnetnratiOn CondrVrwy, tMvsrWty Archkeds Ofaee rsoornrnends a 10% Con ingency. <br />'329-11 oonunttrrwd by SMF. Needs lo be cordirmed in writing. Estknate includes do" txu1 1. <br />' D0WV C- MWtodon fees praWOWy paid by Va* Development CmVwy <br />Winnal lead abatement prarneters It Window, ors replaced wfdr new units <br />' No frarda have been allocated to the design, mrasatton or renovation of ow existing Camtege House <br />' Recom erbed by Urrlversity A"IteW's Office <br />