My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07242018 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2018
>
07242018 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:26:54 PM
Creation date
8/14/2018 12:22:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
7/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA REVIEW SESSION <br />JULY 19, 2018 224 <br />ATTEST: <br />i da M. Martin, Clerk <br />James A. Mueller, Member <br />REGULAR MEETING JULY 24, 2018 <br />The Regular Meeting of the Board of Public Works was convened at 9:35 a.m. on Tuesday, July <br />24, 2018, by Board President Gary A. Gilot, with Board Members Suzanna Fritzberg and <br />Elizabeth Maradik present. Board Members Therese Dorau and James Mueller were absent. Also <br />present was Board Attorney Clara McDaniels. <br />APPROVE MINUTES OF PREVIOUS MEETING <br />Upon a motion made by Ms. Maradik, seconded by Ms. Fritzberg and carried, the Minutes of the <br />Agenda Review Session, Regular Meeting and Claims Meeting of the Board held on July 5, July <br />10, and July 17, 2018, were approved. <br />REJECT BIDS — ERSKINE CLUBHOUSE RENOVATION — PROJECT NO 116 108 (SSDA <br />TU <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found <br />to be sufficient. Mr. Kyle Silveus, Engineering, requested bids be rejected, noting the bid <br />opening has been delayed until August by addendum. Upon a motion by Ms. Maradik, seconded <br />by Ms. Fritzberg and carried, the Board rejected bids. <br />OPENING OF BIDS — NORTH STATION WELL NO. 1 REPLACEMENT — PROJECT NO. <br />117-031 (WATER WORKS ENGINEERING) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found <br />to be sufficient. The following bids were opened and publicly read: <br />R. YODER CONSTRUCTION <br />27453 CR 150 <br />Nappanee, IN 46550 <br />Bid was signed by: Kevin Yoder <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: $519,600.00 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Fritzberg and carried, the above bid was <br />referred to Engineering for review and recommendation. <br />OPENING OF BIDS — MIAMI BASIN DRAINAGE IMPROVEMENTS — PROJECT NO. 116- <br />082C (SSDA TIF) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found <br />to be sufficient. The following bids were opened and publicly read: <br />HRP CONSTRUCTION INC. <br />5777 Cleveland Road, PO Box 266 <br />South Bend, IN 46624 <br />Bid was signed by: Matthew Cain <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: $493,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.