My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6A (4)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
11-22-11 Packet
>
6A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 12:12:41 PM
Creation date
11/18/2011 12:39:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r C W9L 119) XAE i..! <br />PROPOSAL <br />PROPOSAL SUBMITTED TO: <br />TELEPHONE NO. <br />DATE <br />11J1/2011 <br />CB Richard Ellis <br />ADDRESS <br />JOB NAME <br />202 S Michigan St <br />G1TY, STATE, AND ZIP CODE <br />JOB LOCATION <br />South Bend, In 46601 <br />Parking Garage Wayne St <br />ARCHITECT <br />DATE OF PLANS <br />Attn; John Martell <br />JOB TELEPHONE <br />We hereby submit specifications ano astlmates Tor: <br />We propose to furnish labor and materials to install a new duct heater for the unit at the parking garage on Wayne St. <br />This to Include removing existing duct heater and haul away. Install new heater and connect to existing ductwork. <br />Reconnect the gas and seat around ductwork. Startup and check operation of unit. <br />We will do all of this for the net sum of $3800.00. If you have any questions please call me anytime. <br />To install a combustion air duct for this room please add $700,00 <br />WE PROPOSE to furnish tabor and material - complete in accordance with above specifications, for the sum of: <br />dollars see above <br />Payment to be made as follows: <br />All material Is guaranteed to be as speclned. All work to be completed In a workmanlike Authorized <br />manner according to standard practices. Any aleratton or deviation from above Signature Fred Mohler <br />speciricallons Involving extra costs will be executed only upon written orders, and <br />will become an extra change order over and above the estimate. All agreements NOTE: This proposal may be withdrawn by us If <br />contingent upon strikes, accidents, or delays beyond our control. Owner to carry fire not accepted within 30 days <br />tornado and other necessary Insurance. Our workers are fully covered by Workman's <br />compensation Insurance. <br />ACCEPTANCE OF PROPOSAL - The above prices, specifications and conditions are <br />satisfactory and are hereby accepted. you ere authorized to do the work as Signatura <br />specified. Payment will be made as outlined above. <br />Sign <br />L <br />Date of Acceptance: <br />PLUMBING HEATING ENGINEERING AIR CONDITIONING <br />8061'. SAMPLE STREET SOUTH SEND, INDIANA 46601 PRONE 574.282.1228 FAX 574.282.1128 <br />%my ldealconsetidated.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.