Laserfiche WebLink
11/3/2011 <br /> ILI <br /> . Northside Boulevard—32"a to 35th Street • Northside Boulevard—350n to Logan Street <br /> I <br /> s <br /> I <br /> m-- <br /> "..�+,a LAM LFArr•U <br /> LFAUTl LFATATA <br /> . Three Major Phases <br /> Advanced signage(Phase I) <br /> . Detour for Northside Boulevard—between 26r^and <br /> Logan(Phase B and III) <br /> • All phases allow,emergency vehicle,postal service. <br /> and trash service access <br /> • Residents and businesses given 3 days notice prior to <br /> access restrictions <br /> Y <br /> - LFA.TATA LFATITA <br /> . Phase I—21a Street to 261h Street(Northside and . Phase 11—26o`Street to 291h Street <br /> Pleasant) . Pathcommuctron <br /> • Path construction • Pavement removal(16",Street to 27e Street) <br /> • New curb west ofIronwood Drive . Repair ofWPA Stone Wall <br /> • New surface for Northside west oflronwood(flogger . Sm.sewer and matall construction <br /> operations) . Coordination with Nurser School for student pick-up and <br /> • Select tree removal drop-off <br /> d�yr.h` <br /> 5 !- <br /> LFATATA - LFAVATAli <br /> 5 <br />