My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-14-11 Council Agenda & Packet
sbend
>
Public
>
Common Council
>
Common Council Agenda Packets
>
2011
>
11-14-11 Council Agenda & Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2011 1:32:01 PM
Creation date
11/10/2011 1:18:10 PM
Metadata
Fields
Template:
City Council - City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
b. Over 1,500 CFM capacity.................................................. 60.99 120.00 <br /> Refrigeration and engine-driven, gas-fired or oil-fired cooling equipment: <br /> A. 1 to 5 horsepower, each........................................................15.00 17.00 <br /> b. 6 to 10 horsepower, each,.............................. ......................25.99 30.00 <br /> c. More than 10 horsepower, each............................................40.09 45.00 <br /> Rooftop combination furnace and air conditioning units, 60,000 to 300,000 Btu's, <br /> each: <br /> a. Up to 7 '/z tons.................................................................... 40.0 45.00 <br /> b. 7 % tons or more................................................................ 60.00 70.00 <br /> kLOJ Heat pumps: <br /> a. 1,000 to 60,000 Btu's input.................................... 2G.00 30.00 <br /> b. 60,000 to 300,000 Btu's: <br /> 1. Up to 7 % tons, each.................................................40.09 45.00 <br /> 2. 7 '/z tons or more, each..............................................75-90 85.00 <br /> c. Earth, coupled water source...................................................58;00 60.00 <br /> I 1 Boilers, steam or hot water: <br /> a. Up to 300,000 Btu's........................I.................... 20.0 30.00 <br /> b. 300,000 Btu's or more..........................................................50,00 60.00 <br /> X1.2_„) Through-wall combination air conditioning/heating and VAV boxes w/coil: <br /> a. First unit................................................................................20.00 30.00 <br /> b. Each additional unit.................................. ..........................x-0.0 1100 <br /> c. Solar heat units..................................................................... 50-00 60,00 <br /> Air handlers <br /> a. 400 CFM to 2,500 CFM........................................................23-A8 30.00 <br /> b. Over 2,500 CFM....................................................................60.00 70.00 <br /> (I4) Back-u enerators - gas line: <br /> a. 10 Kv or less. 30.00 <br /> b. Over 10 Kv. 50 OD <br /> 15 Duct and register: <br /> a. First 15 openings, per s stem. 30.00 <br /> b. Each opening thereafter per system. I,QQ <br /> X16) Gas reconnection, each....................................................................... 20-0030.00 <br /> 17 Gas piping (distribution of piping to equipment) to be included on permit <br /> application <br /> Each gas piping system, per outlet.......................................... 2:90 3.00 <br /> Woodbuming stoves, per flue (including chimney and chimney <br /> connector)..................................................................... 24-A0 30.00 <br /> (l 9) Each reinspection fee............................................................................25-00 30.00 <br /> (20) Each additional final inspection............................................................50;00 60.00 <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.