My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6F (1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
11-08-11 Packet
>
6F (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 12:19:14 PM
Creation date
11/4/2011 12:01:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L FAVAVA <br />APPENDIX A (Continued) <br />Some of the additional Preliminary Design tasks have included: <br />• Traffic Signal Warrant Analyses at two intersections <br />• An alternative Design with Barbee Street Extended on the Carl Kay Property <br />• Driveway Access scenarios for the Republican Headquarters <br />• Alternatives for the Shared Use Path <br />• Alternatives for the cross -over location and access (align with Main Street vs. align <br />with Walter Street) <br />• Driveway Alternatives and meetings with the Scooter Warehouse <br />• Alternatives for the hillside (Park) cut and excavation at the east end of Barbie Street <br />• Radius alternatives at the intersection of Main Street and Chippewa Avenue <br />• Alternatives for the AMC Theatres Driveway Access <br />• Alternative additional drive for the Post Office off Barbie Street Extended <br />• Alternatives for Access to Wendy's from Walter Street. <br />Also, we have included a small contingency for more preliminary design alternatives <br />which are likely as more affected property owners are dealt with. <br />Detail and Final Desi_on Services <br />An additional amount of approximately 2,300 lineal feet of plan work is required to incorporate <br />the original 2nd and 3'd project stages. Also, the extension of work east of South Michigan Street <br />involves the design of a Retention pond and overflow connection. <br />Some of the additional final design tasks and elements include: <br />• 60 additional plan, detail and cross section sheets <br />• Grading Plan design and details for 2 additional areas <br />• One additional Public Information Meeting. <br />Right -of -Way En_aineering (Parcel Plats & Le_ca/ Descriptions) <br />The current design agreement was based upon 26 parcels. As a direct result of the revised <br />connection concept and expanding scope, we have estimated a total of 44 parcels will be <br />needed. <br />The additional parcel work includes: <br />• 7 parcels beyond the original 26 that require RNV acquisition <br />• 4 parcels that will be transferred between the City and Caroline Partners <br />• 2 parcels resulting from vacated RNV that will need to be transferred back to the City <br />• 4 RNV vacation descriptions to expand developable area of the Gates property, <br />remove unused portions of Lafayette Boulevard, Main Street, and Metalmation from <br />public street roles <br />• 1 Parcel that will require ingress /egress easement composition and drawing for <br />altered access. <br />October 12, 2011 Page 2 Project File No. 9020.70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.