My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6F (1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
11-08-11 Packet
>
6F (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 12:19:14 PM
Creation date
11/4/2011 12:01:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A TTA CHMENT "B" <br />SCOPE OF DESIGN SERVICES <br />Environmental Screening, Final Design, Right -of -Way Engineering <br />and Legal Descriptions, Construction Plans, and Bidding <br />South Main St to Lafayette Connector & Roundabout <br />Stage s of Development Area <br />Topoq rap hicaix Location and Contra! Survev <br />The project area will be field surveyed as follows: <br />Lafayette Blvd. from Ireland Road to Chippewa Ave. <br />Main St. from Walter St. to Chippewa Ave. <br />Barbie St. (extended) from Main St. to Michigan St. <br />Walter St. (extended) from Lafayette Blvd. to Michigan St. <br />The survey will correlate to the preferred design set forth in the July 2009 Preliminary Design Report and <br />Plans. This design level survey will include collection of topographical data and the location of all <br />surface features within the anticipated construction limits for the project. Existing monumentation and <br />new horizontal and vertical control will be re- established and/or set to provide project mapping and plan <br />preparation. Our sub - consultant, DLZ, will develop project control utilizing legal monuments for the <br />preparation of Location Route Control Survey as the basis for acquisition and legal descriptions of <br />property to be acquired. <br />The Location Route Control Survey for this Project Stage as well as the other two future stages will be <br />performed in this scope of services. The topographical and project control survey for the two future <br />stages are not included in this scope of services. <br />The location and arrangement of the Three Stages is included with Project Stages Map in Attachment "E ". <br />The survey will be prepared according to Iocal and City approved methods of gathering and recording <br />field data. <br />As a basis for existing utility features contacts will be established for the coordination and identification <br />of buried and surface located utility features. Contact will be made with the Indiana Underground <br />Protection Service, to request a field marking of underground at the time of the field survey. All apparent <br />utility features will be referenced and incorporated into the mapping. A review of as -built and record <br />drawings will be conducted to further identify buried utility lines. A list of utility owners and contact <br />personnel will be updated for information and future project reference. <br />Apparent property line and R/W lines will be included in project mapping. Property ownership will be <br />shown for all parcels adjacent to the project construction limits. <br />1 - Lawson- Fisher Associates p. C, <br />Project File 9018.95 <br />August, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.