My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C (3)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
11-08-11 Packet
>
6C (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 12:20:10 PM
Creation date
11/4/2011 11:55:15 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
if -), Of '��iNt <br />November 3, 2011 <br />Customer: City of South Bend Andrew M Rigley Roofing <br />CIO Division of Community Development dba AMR Roofing <br />227 W Jefferson Blvd Suite 109 Owner: Andrew M Rigley <br />South Bend IN 46601 2913 Smalley Ave <br />Attn: Jeff Young Mishawaka IN 46544 <br />Phone: 235 -5876 Cell: 340 -1305 <br />Address: 325 S Lafayette <br />AMR Roofing will do all of the work requested <br />Flat Roof <br />Remove existing Pressure Sensitive on EPDM Rubber roof 500 lineal feet of seam. <br />Clean and reinstall new Pressure Sensitive with HP 250 Primer. <br />Make all necessary targets to existing box corners with 0.60 Rubber - seam taped in all <br />necessary corners. <br />Make 15 targets on roof. All targets are existing patches on roof. <br />Remove rock in areas to install targets. <br />After installation of targets, rock will be put back. <br />Clean all drains for proper water drainage. <br />Caulk seams on Copper Coping on front of building with Geossel 2300 Clear. <br />Check all other laps to verify intact. If not intact, will make all necessary repairs. <br />Total Job Cost = $3,985.00 <br />Sincerely, <br />Andrew M Rigley, Owner <br />
The URL can be used to link to this page
Your browser does not support the video tag.