My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6E (1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
10-25-11 Packet
>
6E (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 12:32:11 PM
Creation date
10/21/2011 12:19:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br />20 October 2011 <br />Geri Hathaway <br />c/o Innovation Park at Notre Dame <br />1400 E. Angela Blvd. <br />South Bend, IN 46697 <br />Re: Ignition Park - Accelerator Building Pre - Design <br />South Bend, IN <br />Dear Geri: <br />It is a pleasure for BSA LifeStructures to submit a proposal for the architectural and engineering <br />pre- design services for two Accelerator facilities within the Urban Forest Plaza at the center of <br />Ignition Park. <br />The goal of this pre- design process will be to narrow down the program and thus the cost for <br />these facilities prior to moving on with full design services. BSA LifeStructures is confident that <br />this process will not only better prepare the City moving forward with design but will raise the <br />comfort level of all stake holders involved as to the form and function of the facilities. <br />For the pre- design phase of these two 40,000 SF buildings (current assumed SF for the purpose of <br />this proposal), as it is currently outlined in the master plan, BSA LifeStructures would propose the <br />following fee: <br />Pre- Design Services (Architectural and Engineering) $110,000 <br />Reimbursable Allowance (travel and other standard reimbursables)* 5,000 <br />Total Fee (maximum) $115,000 <br />Veimbursables will be billed as part of the base fee up to the $5, 000 maximum. <br />The schedule for this project has yet to be determined, but should align with the development of <br />the remainder of the site. The goal would be to complete the pre - design prior to the end of the <br />calendar year. <br />If the above - referenced fee is acceptable for the work outlined, BSA LifeStructures will require an <br />executed agreement which will be sent out after all parties agree to the scope and fee. We would <br />like to thank you for this opportunity to assist your organization in igniting life sciences growth in <br />downtown South Bend and look forward to working with you in the future. Thanks again. <br />
The URL can be used to link to this page
Your browser does not support the video tag.