My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6E (4)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
10-25-11 Packet
>
6E (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 12:31:41 PM
Creation date
10/21/2011 12:13:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. We will orient your provided cad drawings to our established local coordinate <br />system, perform a drawing translation, and incorporate them into our cad database <br />for the project. <br />Total Cost of Surveying Services as listed above- $8,150.00 <br />B). Platting procedure for Major Subdivision (Primary Phase): <br />1. Preparation of Primary Subdivision Plat. <br />2. Preparation of Application forms and notice to adjacent owners within 300 ft.. <br />3. Use consultant Preliminary Drainage Plan that has previously been prepared for <br />the project site and/or have the City provide to Area Plan Commission approval <br />letter for drainage for the site as required by the subdivision control ordinance. <br />4. Preparation of Site Analysis & Watershed Sheet. Plans would include: <br />a. Boundary Legal Description. <br />b. Existing Setbacks and proposed Setbacks & Easements. <br />c. Proposed Road location & right -of -way widths. <br />d. Relative location of Utilities. <br />e. Location of Storm Water Detention/Retention facilities based on provided <br />consultants work for project site. <br />f. Lot layout with approximate dimensions. <br />Total Cost of Platting Services as listed above- $7,900.00 <br />Q. Platting procedure for Major Subdivision (Final Plats): <br />1. Preparation of Final Subdivision Plat (May be done in more than one Plat). <br />2. Preparation of Application forms. <br />3. Preparation of Engineers Report for Lots and Road in Final Plat based on <br />consultants plans. <br />4. Preparation of Final Plat which would depict: <br />a. Boundary Legal Description. <br />b. Setbacks & Easements. <br />c. Final Road right -of -way widths. <br />d. Final location of Utilities. <br />e. Final location of Storm Water Detention/Retention facilities. <br />f. Final Lot layout with final dimensions. <br />g. Staking of all lot corners for lots shown on final plat. <br />Total Cost of Final Platting Services as listed above (each plat)- $5,900.00 <br />(Note this cost may vary depending on number of lots in each final plat) <br />The Estimated Total Cost of this service contract is $21,950 as detailed above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.