My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6E (2)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
10-25-11 Packet
>
6E (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 12:32:06 PM
Creation date
10/21/2011 12:09:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Ann Kolata <br />October 17, 2011 <br />S61066.400.0001 <br />Page 5 <br />ADDITIONAL WORK <br />Additional work beyond the Scope of Work defined herein shall not be performed until such time <br />as an amendment to this proposal, including the scope of the additional work and associated <br />costs, has been prepared in writing to address the additional work and said amendment has <br />been approved by the Client in writing. <br />Specific items not within the Scope of Work on this project include, but are not limited to the <br />following: <br />collection of more than 72 groundwater samples (including QA/QC samples) to <br />be analyzed for VOCs in accordance with U.S. EPA Method 8260; <br />2. collection of more than 36 groundwater samples (including QA/QC samples) to <br />be analyzed for total and dissolved arsenic and lead concentrations in <br />accordance with U.S. EPA Method 6010; <br />3. disposal of groundwater that is determined to be hazardous; <br />4. submittal of soil samples for laboratory analyses; and <br />5. communication with regulatory agencies regarding the Site. <br />No amendment to this proposal shall be required in situations where additional work may be <br />necessary, as a result of unanticipated or unidentified conditions including, but not limited to, the <br />presence of unidentified or mislocated buried utilities, structures, or objects and unanticipated <br />hazardous materials and /or hazardous or dangerous circumstances, to complete previously <br />identified tasks. Hull shall be compensated for the actual time spent performing this additional <br />work and other direct expenses and subcontractor fees at the billing rates outlined in Table 2. <br />STANDARD OF CARE AND LIMITATIONS <br />Hull shall perform its services using that degree of care and skill ordinarily exercised under <br />similar conditions by reputable members of its profession practicing in the same or similar <br />locality at the time of service. No other warranty, expressed or implied, is made or intended by <br />our proposal or by our oral or written reports. The work will not attempt to evaluate past or <br />present compliance with federal, state, or local environmental or land use laws or regulations. <br />Conclusions presented by Hull regarding the Site to be investigated shall be consistent with the <br />Scope of Work, level of effort specified, and investigative techniques employed. Reports, <br />opinions, letters and other documents will not evaluate the presence or absence of any <br />compound or parameter not specifically analyzed and reported. The presence of radiation, <br />radon, lead, electromagnetic fields, and indoor air pollution will not be investigated, unless <br />specifically stated in the scope of work. Hull makes no guarantees regarding the completeness <br />or accuracy of any information obtained from public or private files or information provided by <br />subcontractors. <br />Again, thank you for the opportunity to conduct additional Phase II ESA activities off -site of the <br />Oliver Industrial Park. Please call me at (800) 241 -7173 if you have any questions. If you <br />
The URL can be used to link to this page
Your browser does not support the video tag.