My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6D (1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
10-25-11 Packet
>
6D (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 12:32:29 PM
Creation date
10/21/2011 12:03:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. ESTIMATE OF INFRASTRUCTURE COSTS AT TRANSPO SITE <br />The Howard Park Neighborhood Master Plan calls for infrastructure improvements at the <br />former Transpo site to enable the proposed residential development on the 10 acre site. The <br />plan calls for new roadway development, new alleys, sidewalk, decorative street lighting <br />and landscaping to enhance the appeal of the neighborhood. The following is an estimate <br />of the infrastructure costs: <br />Total length of roadway: 5,200 LFT <br />Total length of new alleys: 2,600 LFT <br />ITEMS <br />ESTIMATED COST <br />Curb <br />$312,000 <br />Sidewalk <br />$184,000 <br />Street Paving / Construction <br />$110,000 <br />Alley Paving / Construction <br />$58,000 <br />Decorative Lighting <br />$410,000 <br />New Landscpaing / Restoration <br />$100,000 <br />ROW Services (Survey/Platting) <br />$85,000 <br />Total <br />$1,259,900 <br />Contingency (20 %) <br />$251,980 <br />Grand Total <br />$1,511,880 <br />
The URL can be used to link to this page
Your browser does not support the video tag.