Laserfiche WebLink
4. ESTIMATE OF INFRASTRUCTURE COSTS AT TRANSPO SITE <br />The Howard Park Neighborhood Master Plan calls for infrastructure improvements at the <br />former Transpo site to enable the proposed residential development on the 10 acre site. The <br />plan calls for new roadway development, new alleys, sidewalk, decorative street lighting <br />and landscaping to enhance the appeal of the neighborhood. The following is an estimate <br />of the infrastructure costs: <br />Total length of roadway: 5,200 LFT <br />Total length of new alleys: 2,600 LFT <br />ITEMS <br />ESTIMATED COST <br />Curb <br />$312,000 <br />Sidewalk <br />$184,000 <br />Street Paving / Construction <br />$110,000 <br />Alley Paving / Construction <br />$58,000 <br />Decorative Lighting <br />$410,000 <br />New Landscpaing / Restoration <br />$100,000 <br />ROW Services (Survey/Platting) <br />$85,000 <br />Total <br />$1,259,900 <br />Contingency (20 %) <br />$251,980 <br />Grand Total <br />$1,511,880 <br />