My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 1207 designating the SEDA, declaring the SEDA to be blighted, approving a development plan and conditions under which relocation payments will be made and extablishing an allocation area for purposes of TIF
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 1207 designating the SEDA, declaring the SEDA to be blighted, approving a development plan and conditions under which relocation payments will be made and extablishing an allocation area for purposes of TIF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 2:43:25 PM
Creation date
10/20/2011 12:44:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E <br />VII. DESIGN AND DEVELOPMENT CONTROL <br />A. DESIGN CONTROL <br />In order to achieve high quality design, construction, rehabilitation and site <br />development, a design /development review process has been established. <br />1. Powers and Duties <br />The Redevelopment Director has been designated the Design Review <br />Administrator and will be responsible for reviewing the plans and <br />specifications for all projects located within the area that involve new <br />construction, exterior renovation or site work. This review will include <br />design, site planning, open space and other applicable considerations <br />pertaining to compliance with the standards set forth in Design <br />Guidelines. <br />2. Design Guidelines <br />The Redevelopment Commission shall, by Resolution, adopt Design <br />Guidelines for use by developers on all projects within the area. The <br />Design Review Administrator will base approval of plans on how well <br />the proposals have followed these guidelines. The Design Guidelines <br />may be reviewed and revised as necessary by Redevelopment <br />Commission action. <br />3. Permits <br />No permit shall be issued for construction, reconstruction, alteration, or <br />rehabilitation of any building in the area until the plans and <br />specifications for the building have been approved by the Design <br />Review Administrator. <br />' 4. Review <br />All proposals filed with the Design Review Administrator for review <br />and approval shall be accompanied by architectural plans and /or <br />engineering drawings and specifications for the work involved. Such <br />plans shall be reviewed for compliance with the standards and <br />objectives of the plan and Design Guidelines. Upon receipt of the <br />plans the Administrator will review them and either approve the plans <br />as submitted, ask for additional information, approve the plans as <br />-39- <br />12/17/93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.