My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B (6)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
10-11-11 Packet
>
6B (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 12:36:53 PM
Creation date
10/7/2011 12:00:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT A <br />DLZ INDIANA, LLC <br />STANDARD FEE STRUCTURE <br />ENGINEERING /ARCHITECTURAL <br />2011 <br />4Va; Y 1. <br />p <br />6�i.^si`�'�. <br />1 <br />Principal <br />$220.00 <br />49 <br />Division Manager (Chief Engineer) <br />$175.00 <br />50 <br />Department Manager <br />$160.00 <br />55 <br />Registered Land Surveyor <br />$130.00 <br />21 <br />Project Manager <br />$135.00 <br />214 <br />Senior Right-of-Way Engineer <br />$135.00 <br />330 <br />Electrical Engineering Specialist <br />$150.00 <br />53/58 <br />Engineer III/Architect III/Landscape Architect III/ <br />Planner III/Scientist III/Geologist III <br />$125.00 <br />52/57 <br />Engineer II/Architect II/Landscape Architect 111 <br />Planner II/Designer III/Scientist II/Geologist II <br />$115.00 <br />51/56 <br />Engineer I/Architect I/Landscape Architect U <br />Planner It Designer II/Scientist I/Geolo ist I <br />$90.00 <br />28 <br />Designer 1 <br />$75.00 <br />29 <br />Technician <br />$65.00 <br />147 <br />Construction Administrator <br />$105.00 <br />152 <br />Construction Observer <br />$85.00 <br />43 <br />Clerical <br />$50.00 <br />Rates are subject to revision on January 1, 2012. <br />Cost of living/inflation increases of 3 to 7% per annum can be anticipated. <br />S:1 DeptW dministration %Clerical\RATES\201 I Hourly Rates.doc <br />p <br />6�i.^si`�'�. <br />3 <br />.a'#���.«�b'�S. i" ,. S ?t�'✓ M ..�x <br />-� � Y� h*�.�� h` <br />r '^$..l s:> ,_,t,��'iz. <br />Mileage <br />143/99/99 <br />3 — person Survey Crew <br />$185.00 <br />142/99 <br />Topographic Survey Crew (straight time) <br />$145.00 <br />142/99 <br />Topographic Survey Crew (over time) <br />$220.00 <br />63 <br />1 — person Field Crew <br />$100.00 <br />63 <br />1 — person Field Crew (over time) <br />$140.00 <br />GPS <br />1— person GPS/RTK Field Crew <br />$160.00 <br />13 <br />Field Survey Technician <br />$55.00 <br />Rates are subject to revision on January 1, 2012. <br />Cost of living/inflation increases of 3 to 7% per annum can be anticipated. <br />S:1 DeptW dministration %Clerical\RATES\201 I Hourly Rates.doc <br />p <br />6�i.^si`�'�. <br />3 <br />.a'#���.«�b'�S. i" ,. S ?t�'✓ M ..�x <br />-� � Y� h*�.�� h` <br />r '^$..l s:> ,_,t,��'iz. <br />Mileage <br />$0.51 1 mile <br />Travel Expenses <br />@Cost <br />Living Expenses <br />@ Cost <br />Reproduction <br />Cost plus 20% <br />Subconsultants <br />Cost plus 20% <br />Equipment Rental <br />Cost plus 20% <br />Rates are subject to revision on January 1, 2012. <br />Cost of living/inflation increases of 3 to 7% per annum can be anticipated. <br />S:1 DeptW dministration %Clerical\RATES\201 I Hourly Rates.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.