My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B (1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
10-11-11 Packet
>
6B (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 12:38:08 PM
Creation date
10/7/2011 11:54:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend <br />South Bend, Indiana <br />Ignition Park <br />15350001 <br />10.04.11 <br />PREDESIGN PPC <br />Component <br />PHASE JIB <br />Imorovements <br />Stull Street Blvd Extension <br />Sample Street Blvd <br />Circle Drive <br />West Greenway System <br />East Greenway System <br />Center Canal <br />Collection Pond <br />Native Grass Zones <br />Landscaping <br />Utilities <br />Storm Drainage <br />Rain Water Harvesting System <br />Water Main <br />Sanitary Sewer <br />Electric Service <br />Site Lighting <br />Misc. Conduit for future <br />Communication <br />PHASE IB Subtotal <br />Contingency <br />PHASE IB Construction <br />Project Design Fees <br />Relmburables <br />Permit /Legal Fees <br />Surveys /Plats /Studies <br />Unit <br />Quantity <br />Material Cost <br />Labor <br />Total <br />LF <br />900 <br />$190.00 <br />$0.00 <br />$171,000.00 <br />LF <br />1000 <br />$290.00 <br />$0.00 <br />$290,000.00 <br />LF <br />1600 <br />$295.00 <br />$0.00 <br />$472,000.00 <br />LF <br />800 <br />$1,100.00 <br />$0.00 <br />$880,000.00 <br />LF <br />750 <br />$1,100.00 <br />$0.00 <br />$825,000.00 <br />LF <br />600 <br />$250.00 <br />$0.00 <br />$150,000.00 <br />5F <br />100,000 <br />$5.00 <br />$0.00 <br />$500,000.00 <br />SF <br />2,522,995 <br />$0.25 <br />$0.00 <br />$630,748.75 <br />LS <br />1 <br />$250,000.00 <br />$0.00 <br />$250,000.00 <br />LS <br />1 <br />$350,000.00 <br />$0.00 <br />$350,000.00 <br />LF <br />4100 <br />$500.00 <br />$0.00 <br />$2,050,000.00 <br />LF <br />2600 <br />$100.00 <br />$0.00 <br />$260,000.00 <br />LF <br />3000 <br />$50.00 <br />$0.00 <br />$150,000.00 <br />LS <br />1 <br />$200,000.00 <br />$0.00 <br />$200,000.00 <br />EA <br />175 <br />$2,500.00 <br />$0.00 <br />$437,500.00 <br />EA <br />6000 <br />$30.00 <br />$0.00 <br />$180,000.00 <br />LF <br />4600 <br />$50.00 <br />$0.00 <br />$230,000.00 <br />$8,026,248.75 <br />$1,203,937.00 <br />$9,230,185.75 <br />LS <br />1 <br />$0.00 <br />$738,415.00 <br />$738,415.00 <br />LS <br />1 <br />$0.00 <br />$8,000.00 <br />$8,000.00 <br />LS <br />1 <br />$0.00 <br />$7,000.00 <br />$7,000.00 <br />LS <br />1 <br />$0.00 <br />$100,000.00 <br />$100,000.00 <br />Phase 10 Project Cost $10.083.600.75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.