Laserfiche WebLink
South Bend Redevelopment Commission <br />Regular Meeting — September 27, 2011 <br />6. NEW BUSINESS (CONT.) <br />B. South Bend Central Development Area <br />(1) continued... <br />the amount of $13,250. (117 E. <br />WayneNesuvio's Pizza) <br />(2) Proposal for design work for Century <br />Center southern and western entries. <br />Mr. Relos noted that in an effort to further <br />enhance the beauty and character of Century <br />Center, the southern entry where patrons <br />enter from the parking lot, and the western <br />main entrance off St. Joseph St. are in need <br />of improvements. Architectural Design <br />Group (ADG) has been very involved with <br />design and construction oversight of many of <br />Century Center's recent improvements, and <br />is familiar with this city asset. <br />This proposal is for design work to arrive at a <br />cost estimate for the south entry <br />improvements. Improvements under <br />consideration for this entry point are: a new <br />parking attendant booth and its concrete <br />island; pedestrian safety dividers; limited <br />vehicle entry points into and out of the <br />parking lot for vehicular and pedestrian <br />safety; new planters, landscaping, lighting, <br />curbs, and entry walkway pavement. The <br />total cost for design of this entry point is <br />$7,000. <br />The proposal for the west entry is for design, <br />construction documentation, and assistance <br />with the bidding and construction phases. <br />Improvements under consideration for this <br />entry point are: removal and installation of <br />new entry doors; entry walkway pavement; <br />3 <br />