My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004 Performance Based Budget
sbend
>
Public
>
Finance
>
Budgets
>
2004
>
2004 Performance Based Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2014 10:58:01 AM
Creation date
12/18/2007 12:09:28 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
519
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MAJOR CAPITAL PROJECT DESCRIPTION <br />FOR YEARS 2005 - 2008 <br />Combined Sewer Overflow (CSO) $5,320,000 (2005-2008) <br />Long-Term Control Plan <br />This project is needed for implementation of the National Pollutant Discharge Elimination System <br />permit attachment A requirements to reduce; the frequency and severity of CSO events and prioritize <br />elimination of basement flooding. This wall need to ramp up to meet knee-of--the curve floor for <br />water quality improvement. The total capital cost over the next 20 years is prof ected at $100 million. <br />Activi , Date <br />2005 $ 400,000 <br />2006 1,640,000 <br />2007 1,640,000 <br />2008 1,640,000 <br />TOTAL $5,320,000 <br />Funding Source <br />Sewage Works Revenues, State <br />Revolving Loan Funds and <br />Sewage Works Bonds <br />Projected Ongoing_Operatine Cost Impact <br />The capital proj ects will be complemented by companion Best Management Practices (BMP's). The <br />nine minimum controls and maintenance of'Long Term Control Plan projects will cost on the order <br />of $500,000 per year over the next 20 year:>. <br />CENTURY CENTER <br />Convention Hall "C" Upgrades <br />$810,000 (2007) <br />When the Studebaker Museum Board was created and the original factory showroom in downtown <br />South Bend was acquired, the Studebaker Museum was transferred from the Century Center. This <br />transfer freed this space for convention usE;. Upgrades to this convention hall will transform the <br />space from a museum atmosphere into a highly attractive gathering space for conventions. <br />Fundin SgL ource <br />Century Center Revenue & County <br />Activi , Date HoteUMotel Tax <br />2007 810 000 <br />TOTAL $810,000 <br />Projected Ongoing Operating Cost Impact <br />There are no additional operating costs anticipated over and above the renovation costs. <br />D-51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.