My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6A (1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
09-27-11 Packet
>
6A (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 1:49:04 PM
Creation date
9/23/2011 11:33:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1200 COUN»'-Qn BUILDING <br />227 W. JEFFERSON BomEI:IRD <br />Sovr,-I BEND, INDIANA 46601 -1530 <br />J /'7 <br />PHONE 574/ 235 -9371 'u( <br />FAX 574/235-9021 <br />TDD 574/ 235 -5567 <br />CITY OF SOUTH BEND STEPHEN J. LUECKE, MAYOR <br />COMMUNITY & ECONOMIC DEVELOPMENT <br />JEFFREY V. GIBNEY <br />EXFCL'TIVE DIRECTOR <br />Property Address: 3135 Walden Dr <br />Property Owners: Kathleen Rand 993- 0822(h) 631- 5670(w) <br />Date: July 20 _2_011 <br />Inspector: Jeff Yo= <br />Program: Home Revair& Improvement Program <br />Ro <br />1 f'rl • � Tear -off all roof coverings down to bare wood deck on all surfaces. Replace or repair all <br />deteriorated framing members and sheeting. On all areas install 7 /16" OSB sheathing over decking to provide <br />level and adequate nailing surface for new roofing, then with new "TITANIUM-UDL" Synthetic Roof <br />Underlaymeni or approved equal, premium (1 -1 /2 ") metal drip edge along all roof edges, appropriate pipe <br />boots and Owens Corning or Cora -Vent brand corrugated vinyl roof ridge vent for proper attic ventilation, <br />needed transition flashing, step and counter flashing at vertical transitions. Install Ice & Water shield along <br />roof eaves and in valleys. Install 235 -240 lb. Oakridge dimensional, or GAF Timberline dimensional or <br />approved equal on all pitched roof surfaces. <br />The existing flat roof is less that 2 years old and is to remain, however, areas of possible seam failure were <br />found at several areas. Repairs are to include proper cleaning, priming and then covering each seam with a <br />new, minimum, 6" EPDM "peel & Stick" cover tape applied and finished per manufactures recommended <br />installation instructions. <br />Cap shingles are to be an exact color match and are to be manufactured by the same company as shingles. <br />Reattach all loose and replace any missing aluminum soffit and fascia. Trim all trees and overgrowth to a <br />minimum ten (10) feet from roofed surfaces. <br />Gutters: <br />2 O` Furnish and install new white or brown (to match existing fascia & sofflt).027 ga. aluminum <br />seamless gutters and downspouts on home. Gutters and downspouts shall be hung and secured in a manner <br />that effectively carries away storm water. Down spouts shall be installed so all gutters are serviced by at least <br />one. Install minimum 60" downspout extension with elbows at terminal ends of each downspout, all are to <br />extend at least to lawn areas. Cover all with new metal leaf guard expanded aluminum 4' Sections with rieid <br />mountmg flan es <br />$ TOTAL <br />r <br />Company Name: 1I )' _Date:' •1t <br />COMMUNm DEVELOPMENT ECONOMIC DEVELOPMENT FINANCLAL & PROGRAM <br />PAMELA C. MFYFR DONALD E. INKS IVIANAGEMLNT <br />574/235 -9660 5741235 -9371 UzAeETH LvwAw <br />FAY.. 5741235 -9697 5741235 -9371 <br />
The URL can be used to link to this page
Your browser does not support the video tag.