Laserfiche WebLink
David Relos <br />August 30, 2011 <br />Page 4 of 6 <br />overnight delivery) under chain -of- custody procedures. Analysis will also include the analysis of a water <br />sample for QA/QC purposes (Volatile Organic Compound only). <br />Wightman Petrie will plug the boreholes /wells with bentonite once soil and groundwater sampling <br />activities have been completed. <br />Reporting <br />Upon receipt of the laboratory analyses, data will be reviewed and tabularized. Comparison of the data <br />for each respective chemical constituent will be made to the Risk Integrated System of Closure (RISC) <br />Default Closure Values for Residential and Industrial /Commercial Properties. Upon completion of the <br />initial data review, a "Letter Report" will be prepared which presents the sample collection and analytical <br />methodologies used during the field phase of the assessment. Copies of the sample location maps, <br />tabulated data and comparison to RISC Default Closure Values will also be incorporated. <br />Recommendations for any additional assessment activities will be made for review and comment. <br />SCHEDULE <br />Wightman Petrie proposes to commence site investigation activities within one (1) week of receipt of <br />notification to proceed, depending on weather, utility clearance and Geoprobe availability. Once a <br />specific date for the field component of the Phase II has been established, Wightman Petrie will notify the <br />client. Upon mobilization, we anticipate completion of the Geoprobe sampling requiring one (1) day. <br />Should less field time (i.e., 'h -day of Geoprob) be required; you will be billed accordingly. Laboratory <br />analyses will be completed by Pace Analytical on standard one -week turnaround from receipt by the <br />laboratory. Our initial discussion of results will occur within one (1) day of receipt of laboratory analytical <br />results. Our written "Summary Letter Report" will be submitted within one (1) week of the initial <br />conference. <br />COST ESTIMATE <br />An ESTIMATED COST for Phase II Environmental Assessment Services is presented as follows: <br />Field Engineering Services /Project Management <br />Limited Ground Penetrating Radar Survey <br />Geoprobe Rental (assumes 1 -day @ $1,400 /day, including mobilization) <br />Laboratory Analysis: <br />8 soil samples for % Moisture @ $10 /sample <br />8 soil samples for analysis of BTEX constituents @ $65 /sample <br />8 soil samples for analysis of TPH -ERO @ $60 /sample <br />8 soil samples for analysis of carcinogenic PAHs @ $90 /sample <br />5 groundwater samples for analysis of Volatile Organics @ $95 /sample <br />4 groundwater samples for analysis of carcinogenic PAHs @ $90 /sample <br />Reporting <br />ESTIMATED COST <br />$900 <br />$300 <br />$1,500 <br />$80 <br />$520 <br />$480 <br />$720 <br />$475 <br />$360 <br />$1,200 <br />$6,535 <br />Please note that this ESTIMATED COST should be considered a Project Maximum, which Wightman <br />Petrie will not exceed without prior approval. However, should the scope of services require modification <br />(i.e., additional borings) based upon field conditions and /or circumstances that would not have otherwise <br />been anticipated, Wightman Petrie will notify the client of such "changed conditions" and resultant cost <br />implications to the project. <br />