Laserfiche WebLink
South Bend Redevelopment Commission <br />Regular Meeting — August 23, 2011 <br />6. NEW BUSINESS (CONT.) <br />A. South Bend Central Development Area <br />(2) Resolution No. 2933 approving and <br />authorizing the execution of an Addendum <br />to the Master Agency Agreement <br />(Memorial Hospital Streetscape <br />Improvements Project, Bid Packages 3 <br />and 4. <br />Mr. Relos noted that Resolution No. 2933 <br />and its Addendum to the Master Agency <br />Agreement deals with the next two phases of <br />streetscape improvements around the <br />Memorial Hospital campus. This Addendum <br />is for Supplemental Agreement No. 2 from <br />DLZ, which, through the Board of Public <br />Works, will design and prepare construction <br />and final plans, perform surveying, right of <br />way platting, utility engineering, and will <br />provide a statement of probable construction <br />costs for those next two phases. <br />The main improvement projects to be <br />completed around the Memorial campus in <br />the next three years are: <br />• Demolition of selected structures and <br />parking lot improvements on both the <br />east and west sides of the 400 block <br />of N. Michigan St. <br />• Fagade improvements to the buildings <br />on the east side of Michigan between <br />Bartlett and Navarre, the Mar Main <br />Pharmacy building, and the skywalk <br />over Michigan St. <br />• A new, more prominent entrance <br />road, which will allow visitors to <br />more readily identify where to enter <br />the hospital. This new road will be <br />called Park Lane. <br />C8l <br />