Laserfiche WebLink
SPl/CI~f, MEETING <br />Dion-Discrarnination cornrnitrnent fo was completed <br />Five Ten percent (5%) Bid Fond was submitted <br />BID: X3,615,000.00 <br />NOVIJMB~i~ 29 2ao7 <br />~. <br />~_ <br />fTEM Nam DESCRIPTION d7 T' <br /> ICA'O' <br /> PIT ~t <br /> A'TI <br />BB01 Mobaiizataon/Dernobaiizataon ~ 150,000.00 <br />BB02 Project Pl °ng ~ ~7ork Plan(s) Development ~ 10,000.00 <br />BB03 1~bove-Clrade Building Dernolataon `~ 700,000.00 <br />BB04 Below-Grade Fern®lition ~ 250,000.00 <br />_ ~I~05 i3uiiding Material 1Zubblc Itei~noval/Disposal ~6 200,000.00 <br />BB06 Site Debris Rernovai/Demolitaon $ 10,000.00 <br />BB07 Construction ~ Sto Mater ~ 25,000.00 <br />~ I2erno <br />va <br />l/I <br />~ <br />isposal, Including Deater~ng ~ <br /> pp <br />yy <br />pp <br />g <br />Pretr4iatAl80.+nt <br />~ BBO~ Friable Asbestos Contai g Materials ~ 260,000.00 <br /> (inch~dang materials within the t~ els, pats, <br /> vaults, chases, d b °ed) <br />BB09 Non-Friable Asbestos Containing Materials ~ 50,000.00 <br /> {including ateraais within the tb els, pats, <br /> vaults, chases, and b °ed) <br />BB10 I-Iazardous waste Removal ~ Disposal (within ~ 10,ooo.ao <br /> the building's footprints ~ on or above the <br /> blaaldings lowest floor slab) <br />~~ 11 Cont mated ~Jaste Removal Disposal ~ 1®,®00.00 <br /> (within the buildings' footprints ~ on or above <br /> the buildings' lowest floor slab) <br />~ BB 12 <br />-- LTnflversal waste Removal ~ Disposal ~ 1®,®00.00 <br />~~ 13 PCB waste Removal ~ Disposal (within the ~ 5 ,000.00 <br /> buildings' footprints ~ on or above the <br /> buildings' lowest floor slab) <br />BB14 Sate Restoration, Including Fencing, Seeding ~ ~ 105,000.00 <br /> Other Fall Materials <br />BB 15 Undergro d TJtility Costs, Include the `~ 60,000.00 <br /> Capping/Closi~zg of Existing IJtilaties to be <br /> Abandoned ~ Proposed ITtilaty Costs <br />__ BB16 Site Ex~avataon and Stockpiling ~ X0,000.00 <br /> <br />131317 <br />,.-- <br />Below Grade TL 7e1 Removal and Disposal. <br />~ <br />25,000.00 <br />BB1~ Soft Costs for Bonding, Insurance ~ Project ~ 130,000.00 <br /> <br />- ~drnanistration <br />BB19 Pe it/C-overn~~nent Regulation Compliance ~ 15,000.00 <br /> Costs, ~nclud~ng but not izrnatcd to IDEM ~i Czty <br />~ <br />- 1_Ttilitics <br />BB20 Cost ofAliowances X1 ,365,000.00 <br />j Refer to Section 01102 <br />BB21 Implementation of Maintenance of Traffic Plan $ 70,000.00 <br />BB22 Environ~~nentai Contingency Costs ~ 5,000.00 <br />_ BB23 Enviro ental `T'esting c~ Site Monitoring $ 50,000.00 <br />13824 Security, Odor, Dust ~ Noise Control ~ 10,000.00 <br />BB25 Maintenance ofTraffic ~ 10,000.00 <br />