|
`-~ '~ '~PECIAI, IVIEETII~TG
<br />1~TGVEl~I13EI~ 29 2007
<br />I'I' ESQ PI T ~°
<br />®a ~. ,
<br />IJ006 Ibis osal of hazardous concrete waste as defined in Section 0200 T'on ~ ~~~. :~ __~
<br /> Pumping, waste characterization, transportation, and disposal of ~ ~~, ~ S ~
<br />IJ007 non-hazardous liquids Gallon ___
<br /> P ping, waste characterization, tr spoi~tation, and disposal of ~ 3.00
<br />LT00~ hazardous liquids Gallon
<br /> Excavation, waste characterization, removal, transportation, and ~2,Oc '
<br /> disposal of 250-3000 gallon derground storage tank system as
<br />~T009 defined in Section 0200. 4'ank
<br /> Excavation, waste charactei~zat~on, removal, taanspo~tat~on, and .?,000.0'0
<br /> disposal of 4000-6000 gallon underground storage tank system as I
<br />LJO10 defined in Section 0200. ~aa~l~
<br /> Excavation, waste cbaracterization, removal, transportation, and X4,000,00 ~~
<br /> disposal of X000-10000 gallon underground storage t k system
<br />LJO11 as defined in Section 0200. `fank
<br /> Excavation, waste characterization, removal, transportation, and X5,000,00 ~
<br />~
<br /> disposal of 12000 gallon underground storage tank system as ~
<br />IJ012 defined in Section 0200. 4'anlc '
<br /> Excavation, waste cl~aractei ization, removal, transportation, and ~
<br />~
<br /> disposal of 20000 gallon ~.u~derground storage tal~l~ system as X6,000.00
<br />LJ013 defined in Section 0200. Wank
<br /> PlacinglPumping Plowable ackfill in abandoned sewer pipil~g, Cu.
<br />LJ014 manhole vaults, structures, and pits. Yd ~ 50.00.---
<br /> I3ackfill and/or Fill obtained, transported, placed, graded, and
<br /> compacted from off site source in accordance with the ~
<br />LTO15 requirements set forth in Section 02300. `fon ~ 10.00 __
<br /> Lump ~~
<br />LT016 St. Joseph County fail Air Filter .Allowance Sum ~ e,: _ _-~
<br />~II~. X5,643,032.00
<br />I'I'IYI o® I~ESCI2IPTI~I~ ~~~ T~T~
<br />
<br /> P I°~
<br /> CA`I'
<br />E~O1 l~obilization/Demobilization `~ 63,000.00
<br />~~02 Project Pl °ng ~ Work Pl (s} Development ~ 10,000.00
<br />~I303 Above-Grade wilding Demolition `~ 517,000.00
<br />~I304 I~elow-Grade Demolition ~ 1,107,652.00
<br />I3~05 wilding 104aterial Nubble I2emoval/Disposal `6 363,000.00
<br />~~06 Site Debris I~eanoval/Demolition ~ 2®,000.00
<br />13I307 Construction ~ Sto Water Removal/Disposal, ~ 7,500.00
<br /> Including Dewatering a~ Pretreatment
<br />~>30~ Friable Asbestos Containing 1Vlaterials ~ 45,000.00
<br /> (including materials witi~l the turar~els, pits,
<br /> vaa.~lts, chases, d b 'ed}
<br />X1309 1~Ton-Friable Asbestos Contai~~ing l~/Iaterials ~ 110,000.00
<br /> (inclrad~ng matel~als within the to els, pets,
<br /> vaults, chases, d boned}
<br />DE 10 Flazardous Waste Removal ~ Lisposal(within ~ 10,000.00
<br /> the building's footprints ~ on or above the
<br />
|