<br />Supplemental Agreement No. 2
<br />Description
<br />Original
<br />SA # 1
<br />SA # 2
<br />New Total
<br />Amount
<br />a.
<br />Field Survey (including
<br />Route Survey Plat
<br />$73,000.00
<br />$10,000.00
<br />$18,700.00
<br />$101,700.00
<br />b 1.
<br />Preliminary Roadway Design
<br />and Plans 20% Complete)
<br />$82,000.00
<br />- $28,700.00
<br />$0.00
<br />$53,300.00
<br />b 2.
<br />Bid Package 1
<br />$0.00
<br />$202,000.00
<br />$0.00
<br />$202,000.00
<br />C.
<br />Maintenance of Traffic
<br />Concepts
<br />$8,000.00
<br />- $4,000.00
<br />$0.00
<br />$4,000.00
<br />d.
<br />Public Information Meeting,
<br />Hourly Rate, as required
<br />$6,000.00
<br />$0.00
<br />$0.00
<br />$6,000.00
<br />e.
<br />Conceptual Traffic Signal
<br />Design
<br />$20,500.00
<br />- $8,200.00
<br />$0.00
<br />$12,300.00
<br />f.
<br />Utility Coordination,
<br />Hourly Rate, as required
<br />$8,000.00
<br />$2,000.00
<br />$5,000.00
<br />$15,000.00
<br />g.
<br />Coordination with
<br />Memorial Hospital and
<br />INDOT, Hourly Rate, as
<br />required
<br />$10,000.00
<br />$2,500.00
<br />$2,500.00
<br />$15,000.00
<br />h.
<br />R/W Engineering (4 Parcels
<br />@$2,700 per Parcel), if
<br />req uired
<br />$27,000.00
<br />- $10,800.00
<br />45,400.00
<br />$10,800.00
<br />i.
<br />Title Abstracting (4 Parcels
<br />@ $325 per Parcel), if
<br />required*
<br />$3,250.00
<br />- $1,300.00
<br />0.00
<br />$1,950.00
<br />j.
<br />Geotechnical Evaluation
<br />$7,500.00
<br />$0.00
<br />$15,000.00
<br />$22,500.00
<br />k.
<br />Bid Package 2
<br />$0.00
<br />$48,000.00
<br />$0.00
<br />$48,000.00
<br />1.
<br />Bid Package 3
<br />$0.00
<br />$0.00
<br />$130,000.00
<br />$130,000.00
<br />M.
<br />Bid Package 4
<br />$0.00
<br />$0.00
<br />$90,000.00
<br />$90,000.00
<br />n 1.
<br />Subsurface Utility
<br />Engineering SUE Area 1
<br />$0.00
<br />$0.00
<br />$11,360.00
<br />$11,360.00
<br />n 2.
<br />Subsurface Utility
<br />Engineering SUE Area 2
<br />$0.00
<br />$0.00
<br />$11,360.00
<br />$11,360.00
<br />n 3.
<br />Subsurface Utility
<br />Engineering SUE Area 3
<br />$0.00
<br />$0.00
<br />$24,180.00
<br />$24,180.00
<br />o.
<br />Right of Way Dedication
<br />Plat
<br />$0.00
<br />$0.00
<br />$10,000.00
<br />$10,000.00
<br />p.
<br />Bid Phase, Pre
<br />Construction Meeting and
<br />Construction Phase Office
<br />Services, Hourly Rate, as
<br />required
<br />$0.00
<br />$0.00
<br />$8,000.00
<br />$8,000.00
<br />$245,250.00,
<br />$211,500.001
<br />$320,700.001
<br />$777,450.00