Laserfiche WebLink
• Q2? `1_'0 �` Com munity & Economic Development z <br />1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 <br />To: Redevelopment Commission <br />From: David Relos, Economic Development Plann�, <br />Subject: Resolution No. 2933 and Addendum to the Master Agency Agreement <br />Memorial Hospital Streetscape Improvements Project, Bid Package 3 & 4 <br />Date: August 23, 2011 <br />Attached to this memorandum is Resolution No. 2933, and an Addendum to the Master <br />Agency Agreement, for the next two phases of streetscape improvements around the <br />Memorial Hospital campus. This Addendum is for Supplemental Agreement No. 2 from <br />DLZ, who through the Board of Public Works, will design and prepare construction and final <br />plans, surveying, right of way platting, utility engineering, and a statement of probable <br />construction costs for these next two phases. <br />The main improvement projects to be completed around the Memorial campus in the next <br />three years are: <br />• Demolition of selected structures and parking lot improvements on both the east and <br />west sides of the 400 block of N. Michigan St. <br />• Fagade improvements to the buildings on the east side of Michigan between Bartlett <br />and Navarre, the Mar Main Pharmacy building, and the skywalk over Michigan St. <br />• A new, more prominent entrance road, which will allow visitors to more readily <br />identify where to enter the hospital. This new road will be called Park Lane. <br />This Addendum covers what is called Phase 3 and 4, or the first and third components <br />above. The facade improvements are currently being designed by the Troyer Group, which <br />was approved by the Commission on May 24, 2011. Preliminary concept drawings of the <br />facade improvements are attached, as well as a preliminary concept drawing from 2005 by <br />DLZ for Park Lane. <br />These three components will tie the Memorial Hospital campus into a unified look, will make <br />a dramatic entrance corridor into the downtown core, and compliment the work that has <br />recently been completed north of La Salle St. <br />Staff requests your approval of Resolution No. 2933, and the Addendum to the Master <br />Agency Agreement, in the amount of $320,700. <br />What We Do Today Makes A Difference! <br />