My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-07-06 Redevelopment Commission Minutes Minutes
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
2000-2009
>
2006
>
04-07-06 Redevelopment Commission Minutes Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2007 1:23:36 PM
Creation date
12/11/2007 4:40:13 PM
Metadata
Fields
Template:
General
Date
4/7/2006
Document Relationships
04-07-06 Agenda
(Superseded by)
Path:
\Public\Redevelopment Commission\Agendas & Packets\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br />Regular Meeting -April 7, 2006 <br />6. NEW BUSINESS (CONT.) <br />I. Northeast Neighborhood Development Area <br />There was no business in the Northeast <br />Neighborhood Development Area. <br />J. Douglas Road Economic Development Area <br />There was no business in the Douglas Road <br />Development Area. <br />K. Other <br />7. PROGRESS REPORTS <br />Ms. Sobel gave the Commission an update on South <br />Bend Heritage's progress on the three sites in the West <br />Washington-Chapin Development Area that they were <br />demolishing. The Oil Express demolition is complete, <br />including grading, seeding and new curbs and <br />sidewalks. At Basic Machine, the building is down and <br />environmental analysis and asbestos removal are <br />complete. Infill of the underground coal vault is almost <br />complete, along with resulting sidewalk and curb <br />replacement. At the Engman Natatorium, <br />environmental analysis and asbestos removal are <br />complete. Chlorine tanks have been removed. <br />Demolition of the pool area and parking lot is complete. <br />Commissioners thanked South Bend Heritage for their <br />leadership in removing these eyesores. <br />Mr. Inks noted that staff has closed with South Bend <br />Chocolate Company on the former Osco's building. <br />That was one of four sites staff had out for proposal last <br />winter. <br />The South Bend Stamping plant demolition is <br />approximately 1/3 complete---500 sft is down. The <br />remaining 2/3 is more difficult and will proceed more <br />slowly. <br />THERE WAS NO BUSINESS IN THE NORTHEAST <br />NEIGHBORHOOD DEVELOPMENT AREA <br />THERE WAS NO BUSINESS IN THE DOUGLAS <br />ROAD DEVELOPMENT AREA <br />PROGRESS REPORTS <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.